scholarly journals Method for control of the start-up regulating devicefor power transformers of the power supply system

Author(s):  
V. S. Klimash ◽  
B. D. Tabarov

Three-phase thyristor switches are designed for pulsed formation of inrush currents of electrical equipment with their subsequent shunting in steady state operation. In transformer substations, they perform a bumpless turning on of a power transformer by connecting its primary winding first to two phases of the network at the moment of zero crossing by the phase voltage of the network third phase, and then to the network third phase at the moment of zero crossing by the line voltage of the other two network phases. In this case, the starting currents of the transformer almost immediately enter the steady state without the appearance of constant components in the magnetization currents and voltage drop. To expand the functionality of thyristor switches, it is proposed, in addition to bumpless turning on of a power transformer, to disconnect it without arcing between the contacts of electrical equipment, as well as to carry out continuous voltage regulation for consumers when voltage in the network changes. The proposed method and structure for its implementation on the basis of two three-phase thyristor reactor keys and a capacitor bank make it possible while changing the network voltage to stabilize the generated reactive power at the input of the substation without creating the current distortions in the power transformer and power transmission simultaneously with stabilizing the substation output voltage. Modeling and research of the start-regulating device as part of a transformer substation was carried out in the MatLab environment. The results of numerical experiments in stationary and dynamic modes of the substation operation showed the feasibility of using the developed technical solutions for the industrial power supply system.

2021 ◽  
pp. 69-77
Author(s):  
Boris Alexeevich Arzhannikov ◽  
◽  
Alexander Viktorovich Paranin ◽  

At development of common concept of current collection for three-phase traction power supply system there is the need to select and substantiate main design parameters of catenary suspension. For this purpose, the authors have carried out analytical calculations and developed a numerical mathematical model that allows assessing catenary statics and it’s dynamics in interaction with current collector. On the basis of results of modeling, the authors have substantiated and selected all the required parameters. In particular, they have determined the permissible speed of trains and maximal length of catenary spans.


2017 ◽  
Vol 2017 ◽  
pp. 1-14 ◽  
Author(s):  
Fei Chang ◽  
Zhongping Yang ◽  
Fei Lin

Significant disadvantages in power quality especially the unbalance problem and neutral sections restrict the evolution of conventional traction power supply system. A new traction power supply system based on three-phase to single-phase converter is studied, which can transfer active power from three-phase grid to single-phase catenary. One catenary section could be utilized in the new traction power supply system instead of the multiple split sections in conventional system. Three-phase to single-phase converter is the core equipment of new traction power system. MMC (modular multilevel converter) structure of AC-DC-AC substation is proposed in this paper. To solve the problem of the capacitor voltage balancing in MMC, a parallel sorting algorithm based on field programmable gate array (FPGA) is studied. And the correctness and effectiveness of the algorithm are verified by experiments. In addition, it is inevitable that the AC grid voltage will be unbalanced caused by the fault in the new system. Therefore, this paper focuses on the analysis of the effect of the unbalanced grid voltage on the operating characteristics of the MMC system. Finally, the correctness of the theoretical analysis is verified by simulation.


2017 ◽  
Vol 22 (4) ◽  
pp. 18-24
Author(s):  
Viktor Volodymyrovych Kaplun ◽  
Volodymyr Mykolaiovych Bobrovnyk ◽  
Mykhailo Yukhymovych Artemenko ◽  
Serhii Yosyfovych Polishchuk

Author(s):  
Oleg Arsent'ev ◽  
Evgeniy Krylov

the questions of the organization of power supply system with control elements to reduce the impact of peak loads on the operation of electrical equipment and reduce energy costs