The environmental impact assessment process for oil and gas extraction projects in the Russian Federation: possibilities for improvement

2009 ◽  
Vol 27 (1) ◽  
pp. 77-83 ◽  
Author(s):  
Svetlana Solodyankina ◽  
Johann Koeppel
2003 ◽  
Vol 05 (03) ◽  
pp. 321-338 ◽  
Author(s):  
Nicole Kovalev ◽  
Johann Koeppel

The Environmental Impact Assessment (EIA) system in the Russian Federation has an extensive set of rules, the main ones are the Assessment of the Environmental Impact (OVOS) of a project and the State Environmental Review (SER). The SER is designed as an investigation of both a project and of its OVOS by an independent expert commission, which is appointed by the federal and regional environmental bodies. The decision of the commission is binding. In addition, a Public Environmental Review (PER) can be conducted by NGOs and recognised by the state. A mandatory component of the EIA in Russia is public participation. The process of public participation is regulated by Russian legislation (for example the Land Code, the OVOS guidelines and autonomous regional laws) and can take various forms. All these opportunities are established on paper; in reality, they are not always taken into account. There are a number of case studies used to observe the extent to which the public has an impact on environmental decision-making. Selected cases include examples in which the public was passive, in which it undertook limited activities, and in which participation was strong and projects were improved or stopped.


Author(s):  
Xabier Guinda ◽  
Araceli Puente ◽  
José A. Juanes ◽  
Francisco Royano ◽  
Felipe Fernández ◽  
...  

The high energy demand and the threat of climate change have led to a remarkable development of renewable energies, initially through technologies applied to the terrestrial environment and, recently, through the awakening of marine renewable energies. However, the development of these types of projects is often hampered by failure to pass the corresponding environmental impact assessment process. The complexity of working in the marine environment and the uncertainties associated with assessing the impacts of such projects make it difficult to carry out objective and precise environmental impact assessments. AMBEMAR-DSS seeks to establish a basis for understanding and agreement between the different stakeholders (project developers, public administrations, environmental organizations and the public in general), in order to find solutions that allow the development of marine renewable energies, minimizing their environmental cost. For this purpose, a DSS is proposed which, based on cartographic information and using objective and quantifiable criteria, allows comparative assessments and analyses between different project alternatives. The analytical procedures used by the system include, among others, hydrodynamic modeling tools and visual impact simulators. In addition, impacts on marine species are assessed taking into account intrinsic ecological and biological aspects. The magnitude of the impacts is quantified by means of fuzzy logic operations and the integration of all the elements is carried out by an interactive multi-criteria analysis. The results are shown in tables, graphs and figures of easy interpretation and can be also visualized geographically by means of a cartographic viewer. The system identifies the main impacts generated in the different phases of the project and allows establishing adequate mitigation measures in search of optimized solutions. The establishment of the assessment criteria has been based on the abundant, but dispersed, scientific literature on the various elements of the system and having the opinion of experts in the various fields. Nevertheless, the DSS developed constitutes a preliminary basis on which to build and improve a system with the input of researchers, promoters and experts from different disciplines.


1992 ◽  
Vol 32 (1) ◽  
pp. 413
Author(s):  
Peter Farrell ◽  
John Yeates

A mosaic-like compendium of information on the marine biotic environment of the North West Shelf has been compiled from a number of different sources. The areas most valued coincide with those most vulnerable to disturbance. Regulatory authorities require some form of impact assessment to be carried out by oil and gas explorers and producers as a condition of operation. Considerable expenditure is incurred annually by these companies in complying with these requirements, but current assessment methods do not always consider the scale of possible impacts nor the scientific validity of the results. Despite acceptance, and therefore implied approval of these assessments by the regulatory authorities, adjustments should be made to the current methodology to improve the cost effectiveness of the assessments and to improve the scientific validity of the results.Design of environmental impact assessment of exploration and production operations should consider the relative weighting given to potential acute versus chronic impacts. Prediction of possible impacts enables quantifiable relevant parameters for impact assessment to be identified. Monitoring of indicator species is a cost-effective method of detecting acute effects. Community census methods can be used to detect chronic effects.Statistical analysis of data is a vital, yet frequently ignored, aspect of environmental impact assessment, as is the depositing of voucher specimens for future reference. Statistical analysis can be based on either changes in the difference between specific parameters at the impact and control sites, or comparison of variance between sites over time. Decisions regarding sample area and number of sample replicates should be made based on the required precision of the assessment.


Sign in / Sign up

Export Citation Format

Share Document