scholarly journals EXAMINATION ON DETERMINING THE QUALITY OF FINISHING WORKS PERFORMED

2020 ◽  
Vol 21 (1) ◽  
pp. 452-462
Author(s):  
N. Matsak ◽  
S. Kirilenko ◽  
О. Posashkov

This article considers the issues of forensic structural engineering examination to determine the quality of finishing works. The procedure for carrying out these works has been characterized, attention has been paid to building regulations and rules regarding the execution and acceptance of works on finishing coatings. The mandatory requirements for their quality are given and described. The process of forensic structural engineering conduct has been determined and the main problems and issues that arise while establishing the quality of work performed has been outlined. The main technical characteristics of the construction work on the implementation of the finishing coating, their characteristics are provided. A list of needed documents that are properly executed when ordering the execution of a finishing coating is discussed. Since in practice while conducting forensic structural engineering to determine the quality of finishing works, as well as during surveys, difficulties arise in their production. After all, quality control in construction includes obtaining factual data and comparing them with the established characteristics. The problem of checking the work performed is also considered. Attention is paid to the problem of conducting surveys on such works in order to correctly diagnose and identify technical characteristics of the works being carried out. The principles of conformity assessment are presented, for instance, the functional approach includes such processes as: selection, determination, review and type approval. The main approaches while examining conducted works are revealed. The description of peculiarities when accepting finishing works, as well as mistakes made by builders in performing such works are considered.

2021 ◽  
Vol 23 (1) ◽  
pp. 236-245
Author(s):  
T. Dudnyk ◽  
L. Chintea

Currently, forensic methods and regulations in the field of construction do not explain how quality of work affects the procedure of forensic examinations and research related to determining the work scope. While carrying out building and renovation services, it is possible to control provided construction and renovation services,  establish their physical volume and quality. While research, forensic expert can identify violations of building codes, as well as determine the cost of refurbishment or elimination of defects made providing services. The scoop of performed works is determined by geometric parameters of construction elements, established during field surveys using design and as-built documentation. While carrying out field surveys, it is necessary (along with the determination of service scope) to pay attention to the compliance of the work performed with the requirements of building codes. The article outlines problematic issues and provides a list of basic indicators determining the scoop and quality of the construction works carried out, indicated in the reporting documentation drawn up by contractors based on results of activities in the field of construction. Actual issue arising in the establishment of the scoop and cost of construction work is considered  that quality does not meet the requirements of regulatory documents in the field of construction. It is explained how the quality of the work performed affects the results of research related to the determination of the actually completed volumes of repair, building and renovation and construction work.


2012 ◽  
Vol 424-425 ◽  
pp. 821-823
Author(s):  
Yun Cai

The quality of engineering materials, directly affects the whole building quality and grade, structural safety , the external image and use of function after the completion, therefore, the project materials of construction work is the important content of the quality. Combining the working experience with the practice, this paper makes a discussion on quality control and supervision control of building materials.


2014 ◽  
Vol 3 (1) ◽  
pp. 1
Author(s):  
Haiming Ma

<p>At present, China's construction industry is being launched along with the rapid development of urbanization, the building in functionality are becoming more complex, a growing number of high-rise buildings. Tall template in today’s construction work has been widely recognized and applied. High quality construction template has a very large impact on the overall quality and safety of the project, so the quality of the construction of up to template control. In this paper, building construction quality control measures were analyzed to provide a reference for the industry.</p>


2014 ◽  
Vol 3 ◽  
pp. 1
Author(s):  
Haiming Ma

<p>At present, China's construction industry is being launched along with the rapid development of urbanization, the building in functionality are becoming more complex, a growing number of high-rise buildings. Tall template in today’s construction work has been widely recognized and applied. High quality construction template has a very large impact on the overall quality and safety of the project, so the quality of the construction of up to template control. In this paper, building construction quality control measures were analyzed to provide a reference for the industry.</p>


2013 ◽  
Vol 357-360 ◽  
pp. 1515-1519
Author(s):  
Peng Bo ◽  
Jun Jun Li ◽  
Cheng Qing Liu ◽  
Hong Ru Cai

With the development of the construction work, the quality of construction works is concerned by more and more people. People are increasingly aware of the quality of the project, which is the core of the building works, related to the safety of life and property related to the construction business survival and development. This requires strict control of the quality of building construction, especially for the quality control of key parts of the construction work even more critical. To do this, select the control point of the key parts of the construction works, construction quality control methods and measures for key positions, from the quality control point in addition to meet the quality control requirements in accordance with the general site construction when elaborated higher requirements need its special control measures.


Author(s):  
Harjian Maprilana ◽  
Koespiadi Koespiadi

The success and failure of project implementation is often caused by poor planning and ineffective controls, so that project activities experience various obstacles such as the late completion of the project, the decline in the quality of work and the swelling of implementation costs. Project management is carried out to manage the project from the beginning of the project until the completion of the project properly. The case study in this study is PT. PP (Persero) Tbk. as the executing element of the construction work, it is in charge of organizing the construction of the Surabaya Caspian Tower Apartment in East Java. The CPM (Critical Path Method) method is used to find out how long a project has been completed and look for possible acceleration of project time. From the research using the CPM method, it can be seen that the normal duration of project completion is 453 days which can be optimized to 350 days. This can be done by giving special attention to activities included in the critical path and accelerating some activities by increasing the number of workers


2005 ◽  
Author(s):  
Tanya I. Gelsema ◽  
Margot van der Doef ◽  
Stan Maes ◽  
Simone Akerboom ◽  
Chris Verhoeven

Sign in / Sign up

Export Citation Format

Share Document