scholarly journals  Guidelines of Using Project Management Tools and Techniques to Mitigate Factors Causing Delays in Public Construction Projects in Kingdom of Saudi Arabia

2016 ◽  
Vol 6 (2) ◽  
pp. 90-103 ◽  
Author(s):  
Nasser Obaid Alotaibi ◽  
◽  
Monty Sutrisna ◽  
Heap-Yih Chong ◽  
◽  
...  
2019 ◽  
Vol 10 (1) ◽  
pp. 16-27
Author(s):  
Ahmed M.Z. Sayed ◽  
Sadi Assaf ◽  
Adel S. Aldosary ◽  
Mohammad A. Hassanain ◽  
Abdullatif Abdallah

Purpose The purpose of this paper is to identify the key drivers for adopting electronic bidding (e-bidding) systems in public construction projects located in Saudi Arabia. Design/methodology/approach Literature review was undertaken to identify the drivers of e-bidding practices. Nine drivers, classified under four categories, were identified. A questionnaire survey was developed to assess the significance of the identified drivers. Responses were obtained from 20 large contractors, classified as Grade I and II contractors in Saudi Arabia, and 12 governmental authorities, representing owners of construction projects. The drivers were ranked according to their respective significance index (SI) values. Finally, a Spearman’s rank correlation coefficient was employed to ascertain the extent to which the two parties agreed on the significance level of the drivers. Findings Analysis of the identified drivers revealed that the most significant driver was “reduction in the physical storage requirements of bidding paperwork.” Further, a consensus was observed with regards to the significance of the drivers. The findings of the present study highlight the strong potential of widespread e-bidding adoption in Saudi Arabia. It demonstrates the key drivers for the implementation of e-bidding through the perspective of professionals within the context of Saudi Arabia. Originality/value Prior to this study, no previous research has endeavored to assess the drivers of e-bidding adoption in Saudi Arabia. The adoption of e-bidding will benefit organizations through improved efficiencies, which could potentially lower construction costs, thereby contributing to economic growth and benefitting the society at large.


2017 ◽  
Vol 21 ◽  
pp. 587-595 ◽  
Author(s):  
Ion Șerbanoiu ◽  
Marina Verdeș ◽  
Adrian Alexandru Şerbănoiu ◽  
Bogdan Vasile Șerbanoiu ◽  
Mihaela Munteanu

The current trends in the construction industry, considering the magnitude and complexity of construction projects required the development of an appropriate methodology in the design, commissioning work and completion of works. The objective imposed creation of the "Office of Project Management" and all processes, tools and techniques of project management respects besides applicable standards and legislation construction, also imposed code of ethics and professional conduct of the PMI that guides practitioners professional project management, construction engineers, installers, architects etc. and describes the expectations that they have of themselves and of others.


Sign in / Sign up

Export Citation Format

Share Document