RECREATIONAL-GEOMORPHOLOGICAL LAGOON SYSTEMS OF THE MURAVIEVSKAYA LOWLAND (SAKHALIN ISLAND)

Author(s):  
P.F. Brovko ◽  
◽  
G.N. Dzen ◽  
M.G. Zhukovina ◽  
◽  
...  
2018 ◽  
Vol 44 (6) ◽  
pp. 643-652
Author(s):  
David W. Weller ◽  
Amanda L. Bradford ◽  
Aimée R. Lang ◽  
Alexander M. Burdin ◽  
Robert L. Brownell, Jr.

Author(s):  
R.R. Haliulin ◽  
◽  
S.N. Zakirov ◽  
A.H. Kha ◽  
N.E. Vedernikov ◽  
...  

2019 ◽  
Vol 53 (2) ◽  
pp. 431-479 ◽  
Author(s):  
I. V. Czernyadjeva ◽  
O. M. Afonina ◽  
D. V. Ageev ◽  
E. Z. Baisheva ◽  
T. M. Bulyonkova ◽  
...  

First records of diatom species from the Barents and East-Siberian seas, of Myxomycetes for the Khanty-Mansi Autonomous Area — Yugra, Novosibirsk Region, Trans-Baikal Territory, Basidiomycetes for the Arkhangelsk, Novosibirsk, Rostov and Volgograd regions, Altai Republic, Altai Territory, lichens, calicioid and lichenicolous fungi for the Murmansk, Novgorod and Tver regions, bryophytes for the Lipezk, Voronezh and Volgograd regions, St. Petersburg, Stavropol Territory, Caucasus, Republic of Bashkortostan, Yamal and Gydan peninsulas, Trans-Baikal Territory, Magadan Region, Sakhalin Island, Republic of Uzbekistan are presented. Data on localities, habitats, distribution of recorded species are provided.


1987 ◽  
Vol 19 (12) ◽  
pp. 55-60 ◽  
Author(s):  
M. Lansdell

The operational experience of early lagoons is outlined. The construction of a new generation of lagoons of 2000 PE to 1.000.000 PE capacity and associated practical difficulties are described. Those with innovative and space saving features treated in some detail. One includes an anaerobic baffled reactor with sludge draw-off facilities which entered service in September 1986 and which is being monitored for compliance with “Engelberg Requirements”. Cost information and space requirements for the different systems under construction are included.It is concluded that lagoon systems properly designed and sited are the most appropriate and indeed the only financially viable sewage treatment option to suit Venezuelan circumstances.


1987 ◽  
Vol 19 (12) ◽  
pp. 47-53 ◽  
Author(s):  
J. A. Oleszkiewicz ◽  
A. B. Sparling

Severe climate, intermittent rivers and availability of land make facultative lagoon systems the method of choice in treating primarily domestic sewage from smaller municipalities. The lagoons are designed on a recommended maximum load of 55 kgBOD5/ha d to first cell, while the second cell provides storage. The discharge is twice annually and the occurrence of the spring ice break-up odor period is one of the primary criteria limiting this load. Based on full scale performance data, it is demonstrated that, from the standpoint of odor nuisance, the load to the first cell should be kept equal to or less than 35 kg/ha d. Full scale studies of an overloaded lagoon system show the futility of under-ice aeration for odor control. Mechanism of natural odor control during ice break up is elucidated. Upgrading of the overloaded systems or lagoons receiving significant industrial contribution is best achieved by construction of a 3–5 m deep aerated lagoon preceding the two or more facultative cells in series.


Sign in / Sign up

Export Citation Format

Share Document