scholarly journals PENJADWALAN DAN ALOKASI MATERIAL DENGAN METODE LINE OF BALANCE (LOB) PADA PROYEK PELEBARAN JALAN AP.PETTARANI UTARA MAKASSAR

2020 ◽  
Vol 7 (2) ◽  
pp. 153-161
Author(s):  
Mohammad Januar Fuad
Keyword(s):  

ABSTRAK Pelebaran Jalan dimaksud untuk menunjang pembangunan di sektor-sektor lain dengan tujuan meningkatkan pertumbuhan ekonomi. Proyek Pelebaran merupakan lingkup pekerjaan dengan biaya yang besar. Sehingga memerlukan perencanaan sumber daya. Penelitian ini bertujuan menghitung  jumlah kebutuhan material dan merencanakan waktu penggunaan material di lokasi proyek dengan menggunakan Metode Line of Balance (LOB) pada penyelesaian proyek  dan pelaksanaan pekerjaan. Lokasi penelitian Proyek Pelebaran Jalan AP.Pettarani Utara sepanjang 475 km. Data dikumpulkan dengan cara berupa observasi langsung di lapangan. Hasil penelitian menunjukkan bahwa penjadwalan dan alokasi material dengan menggunakan metode Line of balance (LOB), bisa diketahui dengan lebih detail waktu pelaksanaan pekerjaan tiap stasiun disertai kebutuhan tiap stasiun. Metode Line of Balance (LOB) adalah metode yang sederhana tapi sangat praktis dan tepat untuk proyek konstruksi jalan karena dengan metode ini bisa pekerjaan yang bisa dilaksanakan tanpa berpatok pada perencanaan dala kurva ‘S’. Durasi hari kerja bisa dipercepat dengan meningkatkan produktivitas sumber daya peralatan dan tenaga kerja.   Kata Kunci: Metode Line of Balance (LOB), Konstruksi Jalan

1962 ◽  
Author(s):  
OFFICE OF NAVAL MATERIAL WASHINGTON DC
Keyword(s):  

2021 ◽  
pp. 183-188
Author(s):  
Albert Lester
Keyword(s):  

2007 ◽  
Vol 7 (2) ◽  
pp. 200-211 ◽  
Author(s):  
A. Björnfot ◽  
R. Jongeling
Keyword(s):  

2015 ◽  
Vol 22 (7) ◽  
pp. 944-953 ◽  
Author(s):  
Donghoon LEE ◽  
Dong-Sub KIM ◽  
Gwang-Hee KIM ◽  
Sunkuk KIM

The finish work on high-rise residential buildings is performed simultaneously with mechanical and electrical construction work, which results in frequent work interference and delay. This significantly hinders efficient schedule management. Critical Path Method (CPM) is inefficient when applied to high-rise residential building projects in which work is repeatedly carried out for each floor. Line-of-Balance (LOB) is widely used for its effectiveness in managing repetitive work. LOB was developed into TACT and eTACT (enhanced-TACT) to combine heterogeneous works con­tinuously. In particular, the eTACT schedule management method has an advantage in that it is capable of systemati­cally connecting detailed construction, mechanical and electrical construction projects using a work planning template. This study evaluates the time reduction effect of the eTACT method for a high-rise residential building. A comparative analysis of data on 102 cases of non-applied projects and 44 cases of projects using the eTACT method over a period of 10 years is presented to verify its effectiveness. The result shows that finish work time was reduced by 25% or about 53 days on average.


Sign in / Sign up

Export Citation Format

Share Document