Analysis and Calculation of Substation’s Internal Electric Field Intensity Caused by Incoming and Outgoing Lines

2013 ◽  
Vol 291-294 ◽  
pp. 2428-2431
Author(s):  
Hui Lan Jiang ◽  
Kai Zeng ◽  
Jian Min Liu ◽  
Chao Li

In ultra-high voltage transmission system, the electrostatic induction generated by power frequency electric field will exerts negative effects on the electrical automation equipment within the substation and, in particular, will leads long-term harm to staffs’ health. However, researches of electric field environment in ultra-high voltage transmission system merely concentrate on calculating the electric field intensity caused by three-phase limited length wire or three-phase infinite wire within the transmission, without considering the method of calculating half-infinite wire which represents “one end is fixed, while the other end is infinite length’s wire”. Consequently, a new method named “Charge Simulation-Genetic Algorithm (CS-GA) method” which can efficiently calculate power frequency electric field inside of the substation is proposed in the paper. In CS-GA method, the effective calculating length is determined by genetic algorithm method’s optimization, which in other words, half-infinite length wire is substituted for limited length wire in calculating the electric field intensity. The simulation results indicate that CS-GA method is a relatively accurate, efficient and reasonable way on calculating the power frequency electric field inside of the substation.

2013 ◽  
Vol 448-453 ◽  
pp. 328-331
Author(s):  
Xin Zhao ◽  
Tao Chen ◽  
Wei Wang ◽  
Yan Hong Huang Fu

The power frequency electric field and Electric radiation generated by high voltage transmission line have a great impact on the surrounding environment, which is one of the important research topic on environmental protection and electromagnetic compatibility technology field. In this paper, the information database of typical transmission line and tower established,and the prediction of power frequency electric field intensity of high voltage transmission line has been given by using the 3-D computational method.Then, the major factors affecting the calculation results of electric field is discussed based on the measured data and the error analysis is given.


2018 ◽  
Vol 191 (1) ◽  
pp. 104-110
Author(s):  
Chunping Yang ◽  
Wenbin Zhang ◽  
Nianrong Zhou ◽  
Lijun Tang ◽  
Tianwen Li

2021 ◽  
Vol 2121 (1) ◽  
pp. 012017
Author(s):  
Quanquan Gong ◽  
Yunqi Li ◽  
Zhongju Yang ◽  
Dandan Dou ◽  
Fan Yang ◽  
...  

Abstract In the era of intellectualization, many substation inspection robots are being put into operation, but they will cause electric field distortion in the surrounding space during operation. This paper establishes a three-dimensional simplified simulation calculation model for 500kV substations and inspection robots. Based on the boundary element method, we simulate the power frequency electric field of the substation switchyard and analysis the distortion electric field when the inspection robot is in the station. The results show that when the electric field intensity is strong, the distortion coefficient caused by the robot will be larger, and the maximum can reach 2.25 times, and when the electric field intensity is small, the distortion coefficient will be smaller, and the distortion coefficient is 1.42 times on average.