Research on Evaluation Method for Construction Bidding Projects

2013 ◽  
Vol 357-360 ◽  
pp. 2254-2258
Author(s):  
Yi Ge Liu ◽  
Hai Rong Tang

There are great subjectivity and tendentiousness during bid evaluation of engineering construction projects, which may cause deviation to bid evaluation results of bidding work. BP neural network model for bid evaluation of construction projects is built in the thesis, and the model can solve non-linear issues in the bid evaluation construction engineering projects well. And at the same time, evaluation results of the model are verified with the use of actual index data of sample enterprises, which can confirm effectiveness of such model.

2014 ◽  
Vol 584-586 ◽  
pp. 2159-2164 ◽  
Author(s):  
Jing Geng ◽  
Bing Nan Ren

In this paper, four bidding enterprises participated in the tendering of municipal engineering construction are evaluated in the bidding process, tendering process and bid evaluation of a large museum by applying the fuzzy comprehensive evaluation method and referring to features of municipal engineering construction projects, so as to select the best bidder. With this method, there will be few subjective factors influencing the decision makers during the bid evaluation process, which can reflect the strength of each bidder objectively and accurately, and improve the bid evaluation method in comprehensiveness and rationality.


2018 ◽  
Vol 24 (5) ◽  
pp. 424-436 ◽  
Author(s):  
Fábio Bellotti da Fonseca ◽  
Rosangela Maria Vanalle ◽  
João Alberto Camarotto

Construction costs comprise not only production but also transaction costs, which can be categorized as ex-ante (pre-contractual) and ex-post (post-contractual) costs. No evidence has been found in the literature of research about transaction costs in industrial construction engineering projects. The objective of this paper is to identify ex-ante and ex-post transaction costs in industrial engineering construction projects. To accomplish this, empirical research with 4 case studies was conducted with a large engineering firm in Brazil. This research not only identified transaction costs already found by others, dividing them into ex-ante and ex-post, but also identified that travel, RFP clarification, support to strategic decisions of the owner and knowledge transfer are transaction costs not previously identified in the researched literature but that are very relevant to the respective subject. Therefore, this research confirms that transaction costs should be considered ex-ante and ex-post by owners and contractors in industrial construction engineering projects and enlightens academics and practitioners on ways to achieve the reduction of such costs.


2014 ◽  
Vol 716-717 ◽  
pp. 328-331
Author(s):  
Jun E Liu ◽  
Ming Jie Bi

In order to solve the incompatible problems between each evaluation index when evaluated,the superiority evaluation method was applied in the process of Bid Evaluation of architectural engineering. Using the CRITIC method to determine the weight coefficient of each index , which take into account both the contrast intensity between the indexes and introduces the correlation between indicators to determine the weight coefficient, so that more objective. Calculating the bidders value of superiority degree and maximal is selected as the most suitable bidder, results show that the method is relatively objective evaluation, the calculation is simple and practical.


2021 ◽  
Vol 3 (3) ◽  
pp. 28-36
Author(s):  
Sulistiawati Marioga ◽  
Josefine Ernestine Latupeirissa ◽  
Meti

Pile cap as an important part used in construction engineering. Construction projects have a completion schedule, and pile caps as part of a construction project must not be delayed. The purpose of this study is to determine the factors that cause delays in Pile cap work. The analysis method to calculate the results of questionnaire distribution is simple correlation analysis. The results of this study indicate that there are seven factors causing delays  Pile cap work on the Trans Studio Mall Makassar upgrade project, namely: (1) Lack of manpower, (2) Late delivery of materials, (3) Rainfall intensity factor, (4) Lack of labor expertise, (5) equipment shortage, (6) equipment damage, (7) the factor of the change of design by the owner. From the results of the calculation of the product moment correlation factor of the lack of labor with the Pearson correlation coefficient value of 0.821 has a very strong relationship.


2021 ◽  
Vol 236 ◽  
pp. 05001
Author(s):  
Chunyao Deng

Since the implementation of the reform and opening policy, the full support of engineering construction projects has promoted the rapid development of China's national economy. Among them, engineering consulting management is more and more widely used in engineering projects and economic life. This article first summarizes the importance of the entire process engineering consulting integrated management research. The author analyzes the advantages and significance of the integrated management research of the whole process engineering consulting in China, and further puts forward the application countermeasures of the whole process engineering consulting service in construction projects.


2021 ◽  
Author(s):  
xueying bao ◽  
Zhenxia He

Abstract The current bid evaluation method can no longer meet the needs of green construction of railway construction projects, so a bid evaluation method based on an improved PCA-gray variable weight clustering model is proposed. A bid evaluation index system for railway green construction projects with a hierarchical structure was constructed from three aspects: basic construction ability, business ability and green construction ability, and the index evaluation criteria were given. Considering the high dimensional complexity of the bid evaluation system, the improved PCA method was used to reduce the dimension of the bid evaluation system, and on this basis, an improved linear weighted comprehensive evaluation function was constructed to preliminarily evaluate the construction ability of bidders. Then, the grey variable weight clustering model is used to construct the definite weighted function to further analyze the green construction ability of the bidders and select the optimal bidder. Finally, the method was applied to the bid evaluation of railway engineering projects from Lanzhouxi to Zhongchuan Airport, and the conclusion is consistent with the actual bidders, which proves the applicability and effectiveness of the model.


2020 ◽  
Vol 4 (3) ◽  
Author(s):  
Chaomin Huang

With the continuous advancement of China's urbanization process, the demand for construction projects is increasing, which is both an opportunity and a challenge for construction companies. If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering, then its enterprise benefits and future development prospects will be excellent. However, there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management. This is exactly what we must pay attention to. This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.


2013 ◽  
Vol 790 ◽  
pp. 239-242
Author(s):  
Zhang Lin Guo ◽  
Xiao Fan Yang

According to Construction engineering bid evaluation is affected by many factors,the method based on extension superiority evaluation method and standard variance between-class method was proposed.First, in view of the characteristics of this project, evaluation system was constituted by eight indexes; Then the matter-element model based on superiority evaluation method was established so as to conduct bid evaluation of construction project. Finally, the superiority sort was gained. The result demonstrated this method has advantage of objectivity, practicability and high-efficiency.