Development of Lean Production System for Air Filter Manufacturer Using Value Stream Mapping

2014 ◽  
Vol 564 ◽  
pp. 667-672 ◽  
Author(s):  
Aziz Abdul Faieza ◽  
Wei Lin Ng ◽  
Zulkifli Norzima

High Efficiency Particulate Air (HEPA) filter was introduced during the World War II for removing or blocking very small particles (0.3μm particles) or contaminant from entering the air stream into the clean space. A new HEPA filter production line has been developed, however it has no production management system for the new production line. A lean production management system for HEPA production was developed. Value stream mapping tool was applied by analyzing the current state situation and developed the future state improvement. Production flow was designed into five sessions as a batch flow process to improve the productivity in limited space of working environment and manpower. After reducing the wastes identified in current state study, future state development in production line showed 22% improvement compared to current state study.

Author(s):  
J. Prayugo ◽  
L.X. Zhong

<p>This study aims to identify and reduce waste in PT Rajapaksi Adya Perkasa manufacturing company. The analysis uses the concept of green productivity with Green Value Stream Mapping as the analysis model. Through the GVSM current state, this study calculates the amount of green waste in the production line including seven green waste. The result of this study shows an improvement to minimize the waste that occurs through the GVSM future state. GVSM technique increases the green productivity value from 1.12 to 1.81.</p>


2014 ◽  
Vol 474 ◽  
pp. 73-78
Author(s):  
Jan Vavruška ◽  
František Manlig ◽  
František Koblasa

The main focus when improving business processes is on the analysis of material flow. Thorough analysis of the information flow and associated information systems is still undervalued. Working with inaccurate and/or obsolete data leads to incorrect outputs that negatively affect the entire control process. Analysis of the state of material has to go hand in hand with the information analysis. A mini audit of the information flow and information system can be carried out, which follows the classic principles of VSM (Value stream mapping), in order to make an initial analysis of the information flow and information system. Information about the current state of the process together with a measure how well it is represented by the model in the information system can be obtained thanks to this mini-audit. This article focuses on this mini-audit and briefly describes the auditing process. The details of how to create VSM maps is discussed with the main focus on an information flow where the key elements are the inputs and the outputs of the job orders for planning and production management. Attention is also focused on the form of delays in discrete-event recording in the production process which appear in the information system.


2018 ◽  
Vol 7 (2.29) ◽  
pp. 219
Author(s):  
Zulfa Fitri Ikatrinasari ◽  
Dan Kosasih

PT. AEMI is one of the growing electronic component manufacturing company. By this time, Kaizen project has been run and managed to become a culture in PT AEMI. However, the project has not integrated, comprehensive and not yet has a long-term goals. Implementation of value stream mapping (VSM) in PT AEMI is expected to make Kaizen projects more focused and to produce increasing of the maximum efficiency. In addition, VSM Kaizen is believed to make the those programs more integrated, effective and comprehensive. This study aims to: (1) create a current state mapping in the Department of Quality Control PT. AEMI, (2) identify wastes in the Department of Quality Control PT.AEMI, (3) create a future state mapping at the Department of Quality Control PT. AEMI, (4) make a plan of improvement and analyzing the application. Stages of the study were as follows: (1) identification of work processes, (2) collect and analysis of work process time, (3) analysis of the current state mapping, (4) calculate of lead time and process time, (5) analysis of value added and non value-added activities, (6) analysis of wastes, (7) make a plan of future state mapping, (8) improvement design (improvement planning), (9) implementation of improvement, (10) analysis of the implementation of improvements. The results of this study are: 1) current state mapping at QC Department shows that the total lead time of 848 minutes where there is non-value added activity of 778 minutes. 2) identify waste on the handling process where the product movement from assembly to QC for 2 minutes, movement transactions from assembly to QC for 479 minutes and the waiting time at  inspection area for 727 minutes. 3) future state mapping at QC Department shows that the total lead time of 516.5 minutes where there is non-value added activity of 446.5 minutes. 4) the improvement to do is to change the lay out where final inspection is moved from QC to manufacturing so as to result in reduce of non-value added activity by 46%. 


2020 ◽  
Vol 3 (4) ◽  
pp. 509-521
Author(s):  
Wresni Anggraini ◽  
Anifah Naswan Ilhamda

Standar pelayanan minimal rumah sakit tentang waktu tunggu untuk rawat jalan yang ditetapkan oleh Kemenkes Nomor. 129/Menkes/SK/II/2008 adalah tidak lebih dari 60 menit.  Masalah yang dihadapi oleh Poli Tulip Rumah Sakit X Pekanbaru adalah waktu menunggu pasien lebih dari 60 menit.  Tujuan dari penelitian ini adalah memberikan usulan perbaikan untuk mengurangi waktu tunggu pasien.. Metode yang digunakan pada penelitian ini adalah  lean healthcare menggunakan analisis Value Stream Mapping (VSM) untuk menentukan nilai Process Cycle Efficiency (PCE). Berdasarkan current state value stream mapping nilai PCE saat ini adalah 16,85%, ini berarti efisiensi lini pada Poli Tulip Rumah Sakit X Pekanbaru masih sangat rendah. Proses usulan perbaikan efisiensi lini dengan cara mengidentifikasi dan mengurangi non value added activity dan waste yang paling sering terjadi pada proses pelayanan pasien. Ditemukan waste yang berpengaruh menyebabkan waste delay adalah waste unnecessary movement dan lost oppurtunity to retain or win customers yaitu sebesar 22,11%. Untuk mencari akar penyebab waste dilakukan root cause analysis. Akar penyebab masalah dari waste yang terjadi di lini pelayanan pasien bersumber dari faktor individual pegawai dan manajerial Rumah Sakit. Simulasi future state value stream mapping dengan menggunakan ARENA dilakukan untuk menguji usulan perbaikan, didapatkan  nilai PCE harapan sebesar 36,18 %, yang berarti dengan usulan perbaikan yang diberikan telah meningkatkan efisiensi jalur layanan pasien di Poli Tulip sebesar 19,33%.


2021 ◽  
pp. 1451
Author(s):  
Ahmad Ahmad ◽  
Helena JK ◽  
Andrean Yonathan

PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu  21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.


Author(s):  
Renu Yadav ◽  
Ashish Shastri ◽  
Mithlesh Rathore

To survive in today’s competitive business world, companies require small lead times, low costs and high customer service levels. As such, companies pay more effort to reduce their manufacturing lead times. Value stream mapping (VSM) technique has been used on a broad scale in big companies such as Toyota and Boeing. This paper considers the implementation of value stream mapping technique in manufacturing helical springs by railway spring manufacturing company. It focuses on product family, current state map improvements and the future state map. The aim is to identify waste in the form of non value added activities & processes and then removing them to improve the performance of the company. Current state map is prepared to describe the existing position and various problem areas.. Future state map is prepared to show the proposed improvement action plans. The achievements of value stream implementation are reduction in lead time, cycle time and inventory level. It was found that even a small company can make significant improvements by adopting VSM technology. It was concluded that if we adopt the VSM technique the company could reduce the manufacturing lead time from 36.86 days to 34.06 days.


2017 ◽  
Vol 3 (2) ◽  
Author(s):  
Dion Avellino Suyanto ◽  
Sunday Noya

Fierce competition encourages companies to make continuous improvements to achieve better working efficiency. One method to improve the working efficiency is using the concept of lean manufacturing. The efficiency of the existing work in PT. Rimba Kencana is still not good because there are many processes that are not uniform and because of that, production lead time is increased. By using value stream mapping and value stream analysis tools (VALSAT), the production processes in the company are mapped into the current state mapping and future state mapping. In the current state mapping, the total value of production lead time is 59.49 days and the value of process cycle efficiency (PCE) is 0.013%. After doing improvement on welding department, the total value of production lead time decreased to 48.22 days and the value of process cycle efficiency becomes 0.016%. Keywords: Efficiency, Value Stream Mapping, Value Stream Analysis Tools


Author(s):  
Alok Verma ◽  
Jyotsna Devulapalli

A physical simulation based activity in the form of a board game has been developed to explain the concepts of Value Stream Mapping (VSM) and analysis. The activity explains the basic concepts of Value Stream Mapping, drawing of the Current state map, development of Future state map, and implementation of the future state. Simulation activity is run in three phases and the results of implementing various lean tools are observed. Effects of various tools like the Supermarket, Kanban, and Pull system are observed in a learn-by-doing environment. This simulation activity can be used to compliment training programs in Lean manufacturing.


Sign in / Sign up

Export Citation Format

Share Document