PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu  21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.

2017 ◽  
Vol 3 (2) ◽  
Author(s):  
Dion Avellino Suyanto ◽  
Sunday Noya

Fierce competition encourages companies to make continuous improvements to achieve better working efficiency. One method to improve the working efficiency is using the concept of lean manufacturing. The efficiency of the existing work in PT. Rimba Kencana is still not good because there are many processes that are not uniform and because of that, production lead time is increased. By using value stream mapping and value stream analysis tools (VALSAT), the production processes in the company are mapped into the current state mapping and future state mapping. In the current state mapping, the total value of production lead time is 59.49 days and the value of process cycle efficiency (PCE) is 0.013%. After doing improvement on welding department, the total value of production lead time decreased to 48.22 days and the value of process cycle efficiency becomes 0.016%. Keywords: Efficiency, Value Stream Mapping, Value Stream Analysis Tools


2016 ◽  
Vol 3 (02) ◽  
pp. 52
Author(s):  
Qolli Kusuma ◽  
Pratya Poeri Suryadhini ◽  
Mira Rahayu

PT Agronesia (Divisi Industri Teknik Karet) merupakan perusahaan manufaktur industri pengolahan yang memproduksi berbagai jenis produk karet teknik untuk keperluan industri, salah satunya adalah rubber step. Penelitian ini difokuskan pada rubber step Aspira Belakang yang memiliki gap ketidaktercapaian produksi tertinggi. Pada proses produksi rubber step Aspira Belakang ditemukan waktu menunggu yang mempengaruhi tingkat pencapaian target produksi. Tahap awal dalam penelitian ini adalah dengan mengumpulkan data primer yang diolah untuk menggambarkan value stream mapping (VSM) dan process activity mapping (PAM) current state sehingga diketahui lead time dari proses produksi rubber step Aspira Belakang sebesar 5915.07 detik dengan waktu aktivitas value added sebesar 1131.47 detik atau 19.13% dari lead time. Tahap berikutnya adalah mengidentifikasi penyebab akar masalah waiting time menggunakan peta pekerja-mesin, fishbone diagram dan 5 why. Tahap selanjutnya adalah melakukan analisis 5W1H untuk memaparkan detail masalah dan menentukan rancangan usulan perbaikan menggunakan metode lean manufacturing seperti Quick Changeover dan Display. Rancangan usulan perbaikan berupa perancangan alat potong, pembagian lot pengerjaan compound, pengadaan instruksi kerja, perancangan display, pembuatan batch/stock siap cetak, dan perancangan rak penyimpanan khusus sebagai upaya dalam meminimasi waiting time pada proses produksi rubber step Aspira Belakang. Berdasarkan rancangan usulan yang diberikan didapatkan lead time sebesar 3142.10 detik dengan waktu aktivitas value added sebesar 1131.47 detik atau 36.01% dari lead time.


2017 ◽  
Vol 4 (02) ◽  
pp. 170
Author(s):  
Kuntari Puspa Sari ◽  
Agus Alex Yanuar ◽  
Meldi Rendra

CV. Gradient merupakan perusahaan manufaktur yang memproduksi plastik menggunakan mesin injection molding. Produk pada penelitian ini fokus pada produk spring guide dengan tipe XXX. Berdasarkan hasil observasi, wawancara dan kuesioner terdapat beberapa waste yang ditemukan dalam proses produksinya, salah satunya adalah waste yang menjadi fokus penelitian yaitu waste waiting time. Metode untuk meminimasi waste tersebut adalah dengan menggunakan konsep lean manufacturing. Penelitian dimulai dengan melakukan observasi dan wawancara untuk memperoleh data-data yang menunjang pemetaan proses produksi spring guide yang terjadi dengan menggunakan value stream mapping (VSM) dan process activity mapping (PAM) sehingga diketahui total waktu non-value added akibat waste waiting time adalah 7161.87 detik atau 57.8% dari lead time. Setelah itu, dilakukan analisis akar penyebab waste waiting time dengan menggunakan 5 whys dan fishbone diagram. Hasil dari analisis akar penyebab waste dapat digunakan untuk menentukan usulan rancangan yang akan dibuat berupa jadwal pemeliharaan mesin injection molding menggunakan preventive maintenance untuk mengurangi aktivitas non-value added. Pada kondisi yang akan datang, usulan rancangan dapat menghilangkan waktu menunggu dan waktu perbaikan yang menyebabkan waste waiting time. Berdasarkan future state total waktu non-value added dapat dikurangi menjadi 721.87 detik atau 12.12% dari lead time yang diperoleh dari penghilangan aktivitas menunggu dan aktivitas perbaikan.


2021 ◽  
Vol 1 (1) ◽  
pp. 55-65
Author(s):  
Reza Trisnani ◽  
Amanda Sofiana ◽  
Tigar Putri Adhiana

PT HEW merupakan perusahaan manufacture yang bergerak dalam bidang industri obat tradisional dan pangan olahan. Dalam proses produksinya, MHS melalui 3 tahapan proses yaitu pengolahan, pengemasan primer dan pengemasan sekunder. Permasalahan yang terjadi adalah target produksi dari proses pengemasan, baik primer maupun sekunder belum tercapai. Tidak tercapainya target produksi tersebut disebabkan oleh terdapatnya waste yang menyebabkan aktivitas produksi berjalan kurang optimal. Waste yang ditemukan selama observasi awal yaitu unnecessary inventory berupa WIP, defect, unnecessary motion, inappropriate processing, excessive transportation dan waiting time. Penelitian ini menggunakan value stream mapping untuk memetakan seluruh aliran informasi dan material guna mengidentifikasi waste yang ada di dalam proses produksi. Setelah diidentifikasi, akan ada usulan perbaikan untuk mereduksi waste yang ada. Penelitian dimulai dengan pengambilan data waktu menggunakan stopwatch time study. Waktu proses digunakan dalam value stream mapping untuk mengetahui alur proses dan lead time produksi. Penelitian ini menghasilkan usulan perbaikan yang terdiri atas 5 tindakan. Pada future state mapmenghasilkan production lead time berkurang sebanyak 34.57%, total cycle time berkurang sebanyak 51.85%, line efficiency meningkat sebanyak 11.07% dan aktivitas non value added berkurang sebanyak 61.53% serta target produksi meningkat menjadi 140%.


2018 ◽  
Vol 7 (2.29) ◽  
pp. 219
Author(s):  
Zulfa Fitri Ikatrinasari ◽  
Dan Kosasih

PT. AEMI is one of the growing electronic component manufacturing company. By this time, Kaizen project has been run and managed to become a culture in PT AEMI. However, the project has not integrated, comprehensive and not yet has a long-term goals. Implementation of value stream mapping (VSM) in PT AEMI is expected to make Kaizen projects more focused and to produce increasing of the maximum efficiency. In addition, VSM Kaizen is believed to make the those programs more integrated, effective and comprehensive. This study aims to: (1) create a current state mapping in the Department of Quality Control PT. AEMI, (2) identify wastes in the Department of Quality Control PT.AEMI, (3) create a future state mapping at the Department of Quality Control PT. AEMI, (4) make a plan of improvement and analyzing the application. Stages of the study were as follows: (1) identification of work processes, (2) collect and analysis of work process time, (3) analysis of the current state mapping, (4) calculate of lead time and process time, (5) analysis of value added and non value-added activities, (6) analysis of wastes, (7) make a plan of future state mapping, (8) improvement design (improvement planning), (9) implementation of improvement, (10) analysis of the implementation of improvements. The results of this study are: 1) current state mapping at QC Department shows that the total lead time of 848 minutes where there is non-value added activity of 778 minutes. 2) identify waste on the handling process where the product movement from assembly to QC for 2 minutes, movement transactions from assembly to QC for 479 minutes and the waiting time at  inspection area for 727 minutes. 3) future state mapping at QC Department shows that the total lead time of 516.5 minutes where there is non-value added activity of 446.5 minutes. 4) the improvement to do is to change the lay out where final inspection is moved from QC to manufacturing so as to result in reduce of non-value added activity by 46%. 


2019 ◽  
Vol 7 (2) ◽  
pp. 79-89
Author(s):  
Henny Henny ◽  
Muhammad Kahfi Hadi Syuhada

  Penelitian ini ditujukan untuk menganalisis pemborosan produksi produk Jala Ikan KKP menggunakan lean manufacturing di PT. Indoneptune Net Manufacturing dengan memetakan aliran produksi dan menganalisisnya menggunakan value stream mapping (VSM). Analisis terhadap pemborosan dengan metode VSM dilakukan karena VSM dapat memetakan aliran informasi dan material dari awal sampai akhir dari value stream pembuatan suatu produk. Sehingga dapat dilihat proses mana saja yang merupakan pemborosan. Adapun VSM yang dibuat adalah current-state VSM karena dapat merepresentasikan kondisi saat ini dari aliran produksi yang ada. Hasil yang didapatkan setelah dibuat current-state VSM adalah aliran produksi produk jala Ikan KKP melewati proses spinning, ring roupe, netting dan finishing yang memiliki sub-sub proses yang berbeda. Dari setiap sub-proses tersebut dipetakan nama proses, jumlah waktu cycle time dan changeover time, level inventory, waktu kerja tersedia dan jumlah operator. Penganalisisan pemborosan dilakukan pada setiap sub-proses untuk dapat mengetahui nilai tambah proses tersebut terhadap produk utama yang sedang dikerjakan pada setiap tahapan proses yang berlangsung. Kesimpulan yang didapat yaitu pemborosan yang terjadi di departemen spinning salah satunya adalah delay time karena persiapan sebelum proses peleburan, waktu tunggu karena persiapan proses twist di departemen ring roupe, transportasi berlebih sebelum proses tatekan dan pengerjaan ulang di hoshu 2 di departemen finishing.


Author(s):  
Renu Yadav ◽  
Ashish Shastri ◽  
Mithlesh Rathore

To survive in today’s competitive business world, companies require small lead times, low costs and high customer service levels. As such, companies pay more effort to reduce their manufacturing lead times. Value stream mapping (VSM) technique has been used on a broad scale in big companies such as Toyota and Boeing. This paper considers the implementation of value stream mapping technique in manufacturing helical springs by railway spring manufacturing company. It focuses on product family, current state map improvements and the future state map. The aim is to identify waste in the form of non value added activities & processes and then removing them to improve the performance of the company. Current state map is prepared to describe the existing position and various problem areas.. Future state map is prepared to show the proposed improvement action plans. The achievements of value stream implementation are reduction in lead time, cycle time and inventory level. It was found that even a small company can make significant improvements by adopting VSM technology. It was concluded that if we adopt the VSM technique the company could reduce the manufacturing lead time from 36.86 days to 34.06 days.


Author(s):  
Alok Verma ◽  
Jyotsna Devulapalli

A physical simulation based activity in the form of a board game has been developed to explain the concepts of Value Stream Mapping (VSM) and analysis. The activity explains the basic concepts of Value Stream Mapping, drawing of the Current state map, development of Future state map, and implementation of the future state. Simulation activity is run in three phases and the results of implementing various lean tools are observed. Effects of various tools like the Supermarket, Kanban, and Pull system are observed in a learn-by-doing environment. This simulation activity can be used to compliment training programs in Lean manufacturing.


2019 ◽  
Vol 58 (6) ◽  
pp. 1118-1148 ◽  
Author(s):  
Jagdeep Singh ◽  
Harwinder Singh ◽  
Amandeep Singh ◽  
Jashanpreet Singh

Purpose The purpose of this paper is to cover the significance of lean thinking using value stream mapping and six sigma methodology in managing industrial operations. Design/methodology/approach Lean manufacturing is an efficient approach for identifying and eliminating waste through a continuous improvement via flow of the product/service at the pull of customer in chase of exactness. This study has been carried out in a manufacturing unit of Northern India that was suffering from high production lead time and work in progress (WIP) inventory. Findings The current state and future state maps for the critical product have been prepared. On comparison of both current and future state maps, it was observed that lead time has been reduced by 14.88 percent, processing time by 14.71 percent and wastage of material movement by 37.97 percent. As proposed in model, the WIP inventories have been reduced by 17.76 percent and workforce by 17.64 percent. Further it would lead to the profit of Rs161,800 per annum. Six sigma projects have been carried out to reduce rejections of the critical product P-19 under study. The total length of the product was undersize of the critical product. Root cause analysis technique has been used through strategic DMAIC implementation. Results of investigation demonstrated net savings of rupees 145,560 annually. Originality/value The paper demonstrates the practical application of lean thinking, showing how it can bring real breakthroughs in saving cost in the manufacturing industry.


2012 ◽  
Vol 542-543 ◽  
pp. 302-310 ◽  
Author(s):  
Chen Hua Wang ◽  
Jar Her Kao ◽  
Sanjay Kumar Thakur

The lean manufacturing has been widely applied in the most of the industry sectors. Single Minute Exchange of Dies (SMED) is one of lean manufacturing tools that can be used to further reduce production waste. In order to ensure waste be effectively reduced, lean manufacturing has tools to achieve its goal. The first step is analysis of current state value stream map from the production line. The second step is the use of Single Minute Exchange of Dies to propose and carry out improvement actions in bottleneck process. In this study, the aerospace engine case production lead time was reduced from 9 weeks to 7 weeks by VSM method. The SMED method was applied to improve bottleneck’s setup time from 95.68 minutes to 76.97 minutes. The lean manufacturing tool can help factory to reduce inventory in the WIP.