A Study on Ceramsite Pre-Wetted Time to Work on the Performance of Ceramsite Aggregate Concrete
2011 ◽
Vol 393-395
◽
pp. 11-14
Keyword(s):
This paper analyzes the reasons for delamination of ceramsite aggregate concrete mixture, obtained influencing factors of working performance based on the study of equations of lightweight aggregate motion. Moreover, by experimental study of the different pre-wetted time conditions on working performance, a reasonable pre-wetted time of ceramsite before ceramsite aggregate concrete for construction is summarized as well.
2012 ◽
Vol 166-169
◽
pp. 230-233
2016 ◽
Vol 114
◽
pp. 517-527
◽
2018 ◽
Vol 371
◽
pp. 012006
2009 ◽
Vol 61
(7)
◽
pp. 519-527
◽
2017 ◽
Vol 156
◽
pp. 599-610
◽
2012 ◽
Vol 166-169
◽
pp. 1422-1425
Keyword(s):
2012 ◽
Vol 594-597
◽
pp. 721-724