Construction Schedules Simulation and Prediction of Water Conveyance Tunnel Based on Karst Geological Condition

2012 ◽  
Vol 594-597 ◽  
pp. 1298-1301
Author(s):  
Lei Bi ◽  
Jia Qian Luo ◽  
Da Wei Tong

The construction process of water conveyance tunnel is complex and stochastic under the karst geological condition. Aiming at analyzing the construction process under this special condition, a simulation modeling method of water conveyance tunnel construction is presented. Through demonstrating the simulation analysis and predicting the schedules in a real case study of a water conveyance tunnel, this method is proved advanced and intuitive for formulating and analyzing the construction schedules under the karst geological condition.

2013 ◽  
Vol 368-370 ◽  
pp. 1464-1467
Author(s):  
Chao Gao ◽  
Lei Chen ◽  
Shang Lun Liu

A deep-buried highway tunnel is constructed with complex geological condition which existing an alternation of soft and hard rock and having feature of high ground stress, and extrusion, fall-block and twisted phenomena of supporting structure appear in many places during construction which pose a serious threat to the safety of tunnel construction. In combination with the construction process of Shimenya tunnel, by using the finite difference software FLAC3D, the surrounding rock stability is simulated, and the numerical calculation results of advanced pilot excavation method with different structural inclinations. The conclusion can be used for reference for the design and research of similar tunnels.


2011 ◽  
Vol 5 (6) ◽  
pp. 1297-1306 ◽  
Author(s):  
Ehsan Dadashi ◽  
Kaveh Ahangari ◽  
Ali Noorzad ◽  
Alireza Arab

2017 ◽  
Vol 50 (5) ◽  
pp. 1303-1320 ◽  
Author(s):  
Quansheng Liu ◽  
Jianping Liu ◽  
Yucong Pan ◽  
Xiaoping Zhang ◽  
Xingxin Peng ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document