Online Decision Support Index System Suite for Limiting Short Circuit Current

2013 ◽  
Vol 860-863 ◽  
pp. 1857-1861
Author(s):  
Li Wen Wang ◽  
Bi Qiang Tang ◽  
Ling Ling Pan ◽  
Fei Shi ◽  
Jun Liu

Topology adjustment is a main measure to limit short circuit current, but changes of power grid structure might bring deep impact on power system operation. Measures to limit short circuit current are difficult to apply online due to unable to completely evaluate its safety and feasibility. This paper presents an on-line decision support indicator system, which applied to evaluate online short circuit current level of power grid. Based on practical power grid model and typical cross-section, short circuit current level under the current and future maintenance mode is analyzed, decision support to limit short circuit current is given, and the effectiveness and feasibility of limiting measures are evaluated. Analysis results show that the index system is reasonable.

2019 ◽  
Vol 2 (1) ◽  
pp. 1-28
Author(s):  
Yin Kedong ◽  
Shiwei Zhou ◽  
Tongtong Xu

Purpose To construct a scientific and reasonable indicator system, it is necessary to design a set of standardized indicator primary selection and optimization inspection process. The purpose of this paper is to provide theoretical guidance and reference standards for the indicator system design process, laying a solid foundation for the application of the indicator system, by systematically exploring the expert evaluation method to optimize the index system to enhance its credibility and reliability, to improve its resolution and accuracy and reduce its objectivity and randomness. Design/methodology/approach The paper is based on system theory and statistics, and it designs the main line of “relevant theoretical analysis – identification of indicators – expert assignment and quality inspection” to achieve the design and optimization of the indicator system. First, the theoretical basis analysis, relevant factor analysis and physical process description are used to clarify the comprehensive evaluation problem and the correlation mechanism. Second, the system structure analysis, hierarchical decomposition and indicator set identification are used to complete the initial establishment of the indicator system. Third, based on expert assignment method, such as Delphi assignments, statistical analysis, t-test and non-parametric test are used to complete the expert assignment quality diagnosis of a single index, the reliability and validity test is used to perform single-index assignment correction and consistency test is used for KENDALL coordination coefficient and F-test multi-indicator expert assignment quality diagnosis. Findings Compared with the traditional index system construction method, the optimization process used in the study standardizes the process of index establishment, reduces subjectivity and randomness, and enhances objectivity and scientificity. Originality/value The innovation point and value of the paper are embodied in three aspects. First, the system design process of the combined indicator system, the multi-dimensional index screening and system optimization are carried out to ensure that the index system is scientific, reasonable and comprehensive. Second, the experts’ background is comprehensively evaluated. The objectivity and reliability of experts’ assignment are analyzed and improved on the basis of traditional methods. Third, aim at the quality of expert assignment, conduct t-test, non-parametric test of single index, and multi-optimal test of coordination and importance of multiple indicators, enhance experts the practicality of assignment and ensures the quality of expert assignment.


2015 ◽  
Vol 1092-1093 ◽  
pp. 276-280
Author(s):  
Tie Ying Zhao ◽  
Jun Ling Liu

This paper analyzed high capacity high speed switch’s works and structures, proposed a parallel structure of high capacity high speed switch (FSR) with current limiting reactor. Through analysis of its action process, this paper used EMTP/ATP to simulate FSR action process, analyzed line current and voltage changes in normal and short circuit station. Simulation results show that the method can effectively limit short circuit current level.


2017 ◽  
Vol 2017 (13) ◽  
pp. 2098-2103 ◽  
Author(s):  
Ying-Biao Li ◽  
Shan-Shan Wang ◽  
Guang-Quan Bu ◽  
Yan-Chen Yang ◽  
Bing Zhao ◽  
...  

Author(s):  
Chengzhu Yin ◽  
Miao Wang

The nuclear power site resource is very rich in Jiaodong Peninsula of Shandong Province. It is suitable for construction of the large nuclear power base. The transmission scope and direction of Jiaodong Peninsula nuclear power base is analyzed, and optional transmission plans of Plant 1, Plant 2, Plant 3 and Plant 4 are proposed. The transmission plans are recommended based on technical and economic comparison, which provide good references for construction of the large-scale nuclear power base and power grid development planning. Jiaodong Peninsula nuclear power base is planned to be built in the year of 2016–2030, planning capacity of which is 30500MW. The site of nuclear power base is 100∼400km away from the power load center. The nuclear power will use AC transmission and mainly meet the demand of local power load. The early 15500MW gensets will be accessed to the power grid at 500kV, as the following 15000MW gensets will be accessed at 1000kV UHV (Ultra-high voltage) grid. As the accessing of many large-capacity gensets will produce huge impact to the short-circuit current, sectionalized double-bus configuration is recommended in the 500kV main electrical wiring to reduce the short-circuit current of 500kV bus of nuclear power plant. Double bus section cross wire connection is presented to make sure that every two generators on each bus will be connected to different substations on two transmission lines which are set up on different poles and in different paths, to improve the reliability of the power plant. Through analysis and provement, the construction of large nuclear power base must be based on large and stronge power grid, especially the UHV (Ultra-high voltage) AC grid, to meet the demand of huge nuclear power transmission, and to improve the ability of power exchange and ensure the safety of regional power supply. Also, as the nuclear power plant should better be in base-load operation, the construction of large-scale nuclear power base, would make the system load-control demands increase, which leads to more prominent problems. In order to avoid adding additional depth of peaking power operation and reducing the overall economic operation of power system, power grid should have the necessary means to load-control. Namely the construction of peaking units, such as pumped storage units or gas-fired units at about 5000MW. By analyzing and demonstration, large-scale nuclear power base must rely on large-scale power grid, particularly the support of UHV power grid in order to meet the demond of large-scale power transmission and electricity exchange, and also to ensure regional security of electricity supply.


Sign in / Sign up

Export Citation Format

Share Document