With the development of technology, the power system of offshore facilities (for short: power system) is increasingly complex, short-circuit current calculation process also becomes more complex. The simple recursive algorithm can not meet the requirements of short-circuit current calculation in complex power system. The paper, basing on the principle of short-circuit current calculation, taking modeling ideas, created an equivalent circuit model of power system for short-circuit current calculation. The equivalent circuit model can be used to simplify the progress of calculation and meet the needs of the power system development.


2012 ◽  
Vol 241-244 ◽  
pp. 1802-1811
Author(s):  
Zhi Bo Li ◽  
Peng Gao ◽  
Jian Sheng Ma ◽  
Yong Sheng Yan

To improve the efficiency and accuracy of relay setting calculation of power system, this paper proposed and developed a schematized and open-ended software platform in integrative relay setting. Through the advanced development of the Visio software, the graphical input of the target system topology and component parameters are made possible. The platform can automatically generate PSCAD simulation model according to the topology information and device parameters through an interface program to PSCAD, and use this power system simulation software to improve the accuracy of short-circuit current calculation. With the help of the Bookmark mechanism of WORD software, the platform provides a setting template with general protection components, which forms the basis to realize the open-ended platform. The platform also uses the API interface provided by WORD software to automatically generate the final relay protection setting report document according to the results of short-circuit current calculation and the selected protection setting components. This paper gives in detail the overall framework of the proposed platform, as well as the principle and practice of all the above parts. Moreover, the validity and practicality in improving the automation degree of the relay setting of power plant are shown through practical applications.


2021 ◽  
Vol 39 (5A) ◽  
pp. 723-737
Author(s):  
Yamur M. Obied ◽  
Thamir M. Abdul Wahhab

The coordination between protective devices is the process of determining the most appropriate timing of power interruption during abnormal conditions in the power system. The aim of this work is to coordinate the protection of the 33/11 kV power distribution substation in Iraq using the CYME 7.1 software package. In this paper overcurrent and earth fault relays are simulated in two cases, with time delay setting and instantaneous setting, to obtain the Time Current Characteristics (TCC) curves for each Circuit Breaker (CB) relay of Al-Karama substation (2×31.5 MVA, 33/11 kV) in Babil distribution network. The short circuit current at each CB is calculated and accordingly, the protection coordination for Al-Karama substation has been simulated. The TCC curves have been obtained in two cases for overcurrent and earth fault relays; in a case with time delay setting and in the case with the instantaneous setting. The setting takes into consideration the short circuit current at the furthest point of the longest outgoing feeder and the shortest outgoing feeder.