scholarly journals Impact of COVID-19 on Corporate Liabilities in the Energy & Power Industry

2021 ◽  
Author(s):  
Hao Xiong ◽  
Wen Shi ◽  
Shilin Xu ◽  
Huayu Shen
Space Weather ◽  
2004 ◽  
Vol 2 (3) ◽  
pp. n/a-n/a ◽  
Author(s):  
Sarah Simpson

2020 ◽  
Vol 23 (8) ◽  
pp. 922-939
Author(s):  
N.V. Malinovskaya ◽  
M.D. Malinovskii

Subject. This article deals with the issues relating to improving integrated reporting in terms of dovetailing strategic objectives with capital changes. Objectives. The article aims to develop a system of indicators for disclosure of capital types in integrated reporting of electricity generating companies, as well as recommendations aimed at implementing the fundamental concepts and guiding principles of integrated reporting. Methods. For the study, we used the methods of analysis and synthesis, comparison, generalization, and abstraction. As a case study, we conduct a comparative analysis of the disclosure of six types of capital by the largest electricity generating companies, namely PAO Inter RAO, AO Rosenergoatom and PAO RusHydro. Results. The article formulates proposals for disclosure of capital information to address such a lack of accountability as a contradiction to the principle of coherence. It proposes a system of indicators (core and additional) for disclosure of six types of capital by electricity generating companies. Conclusions. A significant reporting problem is the lack of correlation between key strategic objectives and capital changes. The formulated recommendations for disclosure of capital information can help solve this problem, and increase the attractiveness of the integrated report for capital providers.


Author(s):  
Pham Thi Thu Ha ◽  
Phan Dieu Huong

Underground power grid projects in Hanoi is so urgent that it requires immediate implementation. To synchronously and quickly implement the underground power grid projects, people in charge should not follow the outdated perspectives of just including the power industry, but also need to call for the support and cost sharing responsibility from consumers. This paper aims at approaching the subject both from the producers and consumers’ perspectives to together sharing the cost of putting the power grid underground not only in Hanoi but other metropolitans in Vietnam as well. Field studies (including 104 families) at Hoan Kiem District, Hanoi and CBA method were applied to investigate the willingness to pay (WTP) level of consumers to share the cost with the power industry for the underground power grid projects in Hanoi. The overview of the results shows that cost for the underground power grid in Hoan Kiem District ranging from 30,000 VND/household/month to 46,000VND/household/month. On the other hand, the willingness to pay of a typical household of four people within Hoan Kiem District ranges from 17,000VND/month to 24,000VND/month, with the most favorable method of annual payment within a detailed timeline.


Sign in / Sign up

Export Citation Format

Share Document