Temporary Power Safety Supervision of Building Construction Site

2021 ◽  
2011 ◽  
Vol 368-373 ◽  
pp. 3069-3073
Author(s):  
Sheng Hui Chen ◽  
Hui Min Li ◽  
Xin Ma

In order to improve construction site management, we make the architect’ position as the starting point for our research ,analyze the similarities and differences between the project manager and the architect and transform the traditional building construction management system from centralized system into flat -like system. Furthermore, we propose that the implementation of the system must be assisted with the construction of credit system and the establishment and implementation of personal practice insurance system.


Construction sites records high accident and incident rate due to lack of safety measures. Safety assessment rating is significant for every construction site to know safety status of the particular site. In this research TR safety observation method is used to assess the site performance. As unsafe condition is the key factor in every construction site, this research considers the possible unsafe conditions to assess the site performance. A questionnaire survey is done with the workers to know the existing safe conditions. Results showed that the safety performance of the site is 39%. Then every unsafe condition is ranked with respect to severity rating for detailed analysis. Furthermore bowtie analysis is used to identify the causes and consequences of the unsafe conditions. Through this analysis the owner can reduce the risk of every event and improve the site performance.


2021 ◽  
Vol 7 ◽  
Author(s):  
Takuma Akaki ◽  
Tomoyuki Gondo

The purpose of the present study is to grasp the situation of construction sites easily by distinguishing the movements of construction workers at construction sites from the accelerometer data attached to their waists. For the construction manager to accurately perceive the active or inactive state of his workers, their movements were classified into three distinct categories: walking, standing, and sitting. We tracked and observed two rebar workers for 5 days at a large building construction site. Their movements were classified by two-axis plots of (1) the difference between the maximum and minimum absolute values and (2) the value of acceleration at each second, and visualized by a heatmap among others for this trial. The results showed that despite the difficulty in distinguishing rebar work without a total body movement while sitting, the accuracy of discrimination was 60–80% in walking and sitting. From this analysis, we were able to identify repetitive tasks and the differences between morning and afternoon tasks. Furthermore, by applying simple visualization, we could concisely represent changes in work intensity over a relatively long period.


2018 ◽  
Vol 24 (6) ◽  
pp. 3883-3886
Author(s):  
Ernest Ituma Egba ◽  
Veronica Imakwu ◽  
Friday Ituma Onwe ◽  
Nasiru Zakari Muhammad ◽  
Jibrin Hassan Suleiman

2021 ◽  
Author(s):  
N. A. Shuaib ◽  
N. R. Nik Yusoff ◽  
W. A. R. Assyahid ◽  
P. T. Ventakasubbarow ◽  
M. R. Walker ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document