scholarly journals Rebar Worker Analysis Using a 3-Axis Accelerometer

2021 ◽  
Vol 7 ◽  
Author(s):  
Takuma Akaki ◽  
Tomoyuki Gondo

The purpose of the present study is to grasp the situation of construction sites easily by distinguishing the movements of construction workers at construction sites from the accelerometer data attached to their waists. For the construction manager to accurately perceive the active or inactive state of his workers, their movements were classified into three distinct categories: walking, standing, and sitting. We tracked and observed two rebar workers for 5 days at a large building construction site. Their movements were classified by two-axis plots of (1) the difference between the maximum and minimum absolute values and (2) the value of acceleration at each second, and visualized by a heatmap among others for this trial. The results showed that despite the difficulty in distinguishing rebar work without a total body movement while sitting, the accuracy of discrimination was 60–80% in walking and sitting. From this analysis, we were able to identify repetitive tasks and the differences between morning and afternoon tasks. Furthermore, by applying simple visualization, we could concisely represent changes in work intensity over a relatively long period.

Construction sites records high accident and incident rate due to lack of safety measures. Safety assessment rating is significant for every construction site to know safety status of the particular site. In this research TR safety observation method is used to assess the site performance. As unsafe condition is the key factor in every construction site, this research considers the possible unsafe conditions to assess the site performance. A questionnaire survey is done with the workers to know the existing safe conditions. Results showed that the safety performance of the site is 39%. Then every unsafe condition is ranked with respect to severity rating for detailed analysis. Furthermore bowtie analysis is used to identify the causes and consequences of the unsafe conditions. Through this analysis the owner can reduce the risk of every event and improve the site performance.


2020 ◽  
Vol 1 (1) ◽  
pp. 43
Author(s):  
John F. Y. Yeung ◽  
Daniel W.M. Chan

Amongst all types of construction accidents, industrial practitioners tend to pay less attention to the prevention of fires at construction sites.  Although fires may not occur frequently on construction sites, statistics show that when they do, the consequences are very serious; involving fatalities, injuries, serious project delays and financial loss.  There are many reasons why fires occur on sites, but a simple lack of awareness of the risks of fire is a major contributor.  Fire risk assessment is not commonly performed on sites.  Hence, it is believed that an appropriate assessment method for evaluating potential fire risk is required in order to improve the awareness of fire risk on construction sites.  This paper reports on the key findings of a research project which aims to develop a comprehensive, objective, reliable, and practical fire risk assessment framework for building construction sites based in Hong Kong.  A comprehensive list of those factors (or conditions) which may constitute a fire risk was compiled using desktop research and structured face-to-face interviews with experienced site personnel.  This list of factors was then used to develop a questionnaire survey form and the Reliability Interval Method (RIM) was used to analyse the survey results and determine the relative importance and rankings of the various fire risk factors at a broad level and risk sub-factors at a detailed level.  It was found that the fire risk factor of “Fire Services Equipment and Installations” has the greatest impact on construction site fire safety, with “Means of Escape in Case of Fire” being the second, and “Attitude of Main Contractor towards Fire Safety” being the third.  In fact, it is the main contractor who plays the pivotal role in maintaining construction site fire safety, which is in line with the high ranking given to the fire risk factor of “Attitude of Main Contractor towards Fire Safety”.  The proposed fire risk assessment framework can be used to develop a useful checklist for assessing the overall level of fire risk for a construction site, and to identify any areas needing improvement.  Although the fire risk assessment framework was developed locally in Hong Kong, the research methodology could be replicated in other countries to produce similar frameworks for international comparison.  Such an extension would aid the understanding of the management of fire risk on construction sites and help discover differences between countries.


Author(s):  
Albert Ben-David ◽  
Aviad Shapira

Mega building projects typically employ numerous tower cranes covering the entire area of the building footprint and staging areas with multiple overlapping work envelopes. This paper aims to answer the following question: Are the determinants of crane selection for mega building projects similar to projects serviced by a small number of cranes? On-site interviews found: (1) the visibility of the crane forest in the surroundings of the project affects the approach to crane selection; (2) various modes of action are taken by project management to share information with the neighboring residents and business and to ease the hardships of living and working near a busy construction site; and (3) cranes are often selected and located such that they could dismantle other cranes, due to difficulties of using a dismantling mobile crane in the depth of the crane array.


2012 ◽  
Vol 241-244 ◽  
pp. 3190-3194 ◽  
Author(s):  
Zhi Hong Jiang ◽  
Feng Huang ◽  
Da Xi Wang ◽  
Bo Hu ◽  
Ji Jiang Dou

According to the present situation that China's construction site safety supervision of the development toward informatization, this essay put forward a kind of construction site safety supervisory system based on the internet of things through the introduction of wireless network. At first, combined with the requirements of government and industry, we have analyses the requirements of building construction site for safety supervision. Then combined with the difference between architecture construction site and industrial production safety supervision, referring to the existing industrial video safety supervision system, we put forward the structure of the construction site safety system based on the internet of things. At last, we have also analyses several problems about the contracture of network nodes which should be valued. Wireless network can be better adapted to the changing characteristics of construction site safety supervisory operation, and this will promote effectively the development of safety supervision toward the direction of informationization.


Author(s):  
Federico Ricci ◽  
Giulia Bravo ◽  
Alberto Modenese ◽  
Fabrizio De Pasquale ◽  
Davide Ferrari ◽  
...  

We developed a visual tool to assess risk perception for a sample of male construction workers (forty Italian and twenty-eight immigrant workers), just before and after a sixteen-hour training course. The questionnaire included photographs of real construction sites, and workers were instructed to select pictograms representing the occupational risks present in each photograph. Points were awarded for correctly identifying any risks that were present, and points were deducted for failing to identify risks that were present or identifying risks that were not present. We found: (1) Before the course, risk perception was significantly lower in immigrants compared to Italians ( p < .001); (2) risk perception improved significantly ( p < .001) among all workers tested; and (3) after the training, the difference in risk perception between Italians and immigrants was no longer statistically significant ( p = .1086). Although the sample size was relatively small, the results suggest that the training is effective and may reduce the degree to which cultural and linguistic barriers hinder risk perception. Moreover, the use of images and pictograms instead of words to evaluate risk perception could also be applied to nonconstruction workplaces.


2021 ◽  
Vol 13 (6) ◽  
pp. 3326
Author(s):  
Wei Tong Chen ◽  
Hew Cameron Merrett ◽  
Ying-Hua Huang ◽  
Theresia Avila Bria ◽  
Ying-Hsiu Lin

Construction occupational accidents are often attributed to workers’ having an insufficient perception of how their actions influence safety in the construction site. This research explores the relationship between safety climate (SC) and personnel safety behavior (SB) of construction workers operating on building construction sites in Taiwan. The study discovered a significant positive relationship between SC and SB of Taiwan’s building construction sites, and in turn SC level had a positive impact on SB participation and overall safety perceptions. The higher the SC cognition of Taiwan’s building construction workers, the better the performance of SB was found to be. The dimension of "safety commitment and safety training" had the greatest relationship with SB. Safety training also had a deep impact on the cognition of SB. Therefore, the organizational culture and attitudes to safety coupled with the successful implementation of safety education and training can effectively enhance SC and worker SB on building construction sites in Taiwan, thereby potentially reducing the impacts of the underlying organizational factors behind safety related incidents.


2011 ◽  
Vol 368-373 ◽  
pp. 3069-3073
Author(s):  
Sheng Hui Chen ◽  
Hui Min Li ◽  
Xin Ma

In order to improve construction site management, we make the architect’ position as the starting point for our research ,analyze the similarities and differences between the project manager and the architect and transform the traditional building construction management system from centralized system into flat -like system. Furthermore, we propose that the implementation of the system must be assisted with the construction of credit system and the establishment and implementation of personal practice insurance system.


1981 ◽  
Vol 12 (4) ◽  
pp. 305-312
Author(s):  
Leighton E. Stamps ◽  
Earl J. Folse ◽  
Lawrence A. Fehr ◽  
Bobby L. Eason ◽  
Albert A. Rizzo ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document