scholarly journals Analysis of the Influence of a Strategy-led Planning Approach on Successful Construction Project Implementation

2015 ◽  
Vol 15 (2) ◽  
pp. 13-30
Author(s):  
James Olabode Bamidele Rotimi ◽  
Chamila Ramanayaka

This paper presents arguments for the development of a strategy-led approach to planning and implementation of construction projects. It takes the position that there are deficiencies in traditional planning algorithms, which make them inefficient to cope with the unique character of construction projects. Thus a combination of construction project strategies crafted from experiential knowledge (reflective practice methodologies) and traditional planning algorithms are needed for successful construction project planning and implementation. To confirm the argument, the study investigates the influence of strategies on 35 critical success factors which were identified through literature. It uses a combination of data collected through a questionnaire survey of 40 NZIOB Excellence award recipients for the period 2001 to 2011, and interviews with three subject matter experts to validate the influence of the strategy-led approach towards some selected critical success factors. A correlation analysis shows that there is a positive relationship between increasing project complexity and the use of strategies. Further, content analysis of study information collected suggests that complementary approaches herein referred to as the strategy-led approach is needed to achieve successful project outcomes.

2018 ◽  
Vol 159 ◽  
pp. 01025 ◽  
Author(s):  
Afrizal Nursin ◽  
Yusuf Latief ◽  
Ibrahim

To complete a construction project, it takes the cooperation and collaboration of stakeholder involved in construction projects to obtain optimum project performance. Problems that frequently occur in construction projects is the lack of cooperation, lack of trust, ineffective communication, lack of visualization of the planned buildings and different relationships between stakeholders that project performance is not optimal. To overcome these problems need to develop a model of collaboration between stakeholders in a construction project. The purpose of this research is to identify the critical success factors of the collaboration of design and build construction project team so that can understand the influence of collaboration model to collaboration performance with the geographic, professional, stakeholder, and ethnic cultural boundary spanners in design and build construction project in Indonesia. This research uses factor analysis and variable relation with Structural Equation Modeling (SEM) method. The results found that geographical and ethical boundaries are influencing collaborative performance significantly.


2014 ◽  
Vol 20 (3) ◽  
pp. 350-359 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Valentinas Podvezko ◽  
Nerija Banaitienė

This paper proposes the Analytic Hierarchy Process (AHP) as a tool to rank different critical success factors (CSFs) for construction projects in Lithuania. Considering the current lack of understanding of CSFs within the local context, this study is one of the first attempts to gain an understanding of the CSFs in the local industry. Our study revealed that, for construction projects in Lithuania, clear and realistic project goals, project planning, the project manager's competence, relevant past experience of the project management/team, the competence of the project management/team, clear and precise goals/objectives of the client, the project's value, the project's complexity and uniqueness, the project manager's experience, and the client's ability to make timely decisions are the top-ranking CSFs. In view of these findings, the study highlighted the key areas for successful implementation of construction projects in Lithuania.


2018 ◽  
Vol 8 (2) ◽  
pp. 2685-2688 ◽  
Author(s):  
S. Sohu ◽  
A. A. Jhatial ◽  
K. Ullah ◽  
M. T. Lakhiar ◽  
J. Shahzaib

The success of construction projects is not only crucial to stakeholders but also for the country’s economic and social development. Critical success factors (CSFs) are considered as key to project management practices wich can lead to a construction project success. The aim of this research is to determine and rank the CSFs of highway construction projects in Pakistan. A deep literature review was carried out to determine a set of CSFs for construction projects. After that, a questionnaire based on found CSFs was designed and distributed among construction experts working in highway construction projects of Pakistan. Out of 250 distributed questionnaires, 130 were received completed and validated. Gathered data was analyzed through statistical software SPSS, and critical success factors were ranked based on their mean value. As a result, experienced project management team, effective site management, commitment of all parties to the project, experienced design team, and proper project planning have been determined as the top five critical success factors for highway projects in Pakistan. The findings of this research would help construction practitioners in understanding CSFs and to improve project performance.


2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2016 ◽  
Author(s):  
N. Ramlee ◽  
N. J. Tammy ◽  
R. N. H. Raja Mohd Noor ◽  
A. Ainun Musir ◽  
N. Abdul Karim ◽  
...  

2017 ◽  
Vol 10 (12) ◽  
pp. 139
Author(s):  
Jaafer Y. Altarawneh ◽  
Vinesh Thiruchelvam ◽  
Behrang Samadi

The purpose of this study is to investigate the relationship between the critical success factors and the critical delays in the context of water infrastructure construction projects (WICPs) in the Abu Dhabi Emirate. In addition, the purpose of this paper is to develop a conceptual model to investigate the potential relationship. The literature concerning the critical success and delay factors and the related models that are available provide a starting point for developing the conceptual model. Based on the comprehensive and thorough literature review, all the dimensions of the variables are identified and discussed in detail.This study attempts to reduce the existing gap in the literature regarding the relationship between the critical success factors and critical delay. It forms a foundation upon which further local research can be conducted. In addition, it attempts to identify and point out the most critical success factors that will minimize the delay claims in water infrastructure construction projects (WICPs), as such delays would lead to some of the most difficult and controversial disputes to resolve.  Internationally, it is expected that the findings of this research may help as an evidentiary reference data on which other and further similar comparative researches could be initiated and developed in different environments in terms of cultural, social, contractual, political, and environmental mediums.Finally, the conceptual framework was developed by identifying six (6) variables for project critical success namely Project Management Process (PMP), Project Manager Competency (PMC), Project Team Members’ Competency (PTC), Project Organizational Planning (POP), Project Resources’ Utilization (PRU) and Project Organizational Commitment (POC).