Case Studies in Organizational Project Management

2016 ◽  
Vol 6 (2) ◽  
pp. 26-35
Author(s):  
Vladimír Krajčík ◽  
Pavel Vlček

Abstract The article focuses on process management in public administration using the specific case study of the statutory city of Ostrava. Based on the selected part of the PAPRIS methodology, the process management is verified, and conclusions from the application of information system e-SMO ("Electronic Statutory City of Ostrava") are generalized. Ostrava is third the biggest city in Czech Republic with approximately 320 thousand citizen. Article describes experiences with SW implements, which are used for model of process in public administration. Particulary at local authority of Ostrava town. Model of process is a basis for reengineering of process in state administration and preparation for implementation of big information systems. Mapping of process is providing implement and confirmation methodology to identify existing processes. Problem with its using consist in that, senior manager don’t informs, what organization is determination by processes. If are not described in given to organization current processes, or how would have had look new optimum processes, will not endeavour about reengineering successful. Procedural analysis namely offer tool and check methodology to identification current suit („ at") and it is possible him use either as instruction („ how so about to be") for reengineering function handling administrative and self-rule activities. Purpose of the article: The PAPRIS methodology was used when defining the objectives for implementation of the information system for public administration (PAPRIS - Process Approach - Public and Regional Information System). This methodology has been elaborated by one of the authors and published in a very general scheme when solving many case studies (Krajčík, 2006), (Krajčík, 2007), (Krajčík, 2013) (Krajčík, 2014). We assume that the PAPRIS is primarily a methodology with incorporated elements of procedural approach for project management in public administration information systems (PAIS). The specific supporting process of communication between the client and the e-SMO ("Electronic Statutory City of Ostrava") system has been chosen for verification. The model of supporting communication process, created by ARIS tools, is crucial, and the structure of scripts (ICM and IVR) is subsequently made. The aim of this article is to verify that the methodology is sufficient and appropriate to manage such a large project such, undoubtedly, is the e-SMO (Vlček, 2009). Methodology/methods: Defined productive and non-productive processes with their defined process cuts represent a crucial category for the process structure of IS projects. This is fully accepted by the PAPRIS methodology. Process cuts are understood, in the logic modelling according to the PAPRIS methodology, as clearly defined logic directional cuts in three-dimensional space of all project processes. The process set is systemically categorized, in a given logic directional cut, into mutually disjoint process subsets, which are characterized by this particular directional operator. The directional operator always has a clear logical allocation that is based on the construction of a process view. Theoretically, an infinite number of process views can be used. One of the important issues in a methodology for the case studies includes the size of the research sample. It is usually assumed that there is no ideal number of cases and that the number between four and ten usually provides good results. Other authors defining against any quantitative standards for any determination of the sample size of the case studies, since such an approach denies the internal logic of this methodology and the richness of the information obtained from participants in the research. Research which is carried out using case studies does not aspire on compliance with the requirement the representativeness of the sample. (Štrach, 2007). Methodology of case studies is among the established guidelines of qualitative research (Štrach, 2007). Research on using case studies in the last 30 years has seen an extraordinary increase in social-scientific research, including research on business and management (Dul, Hak, 2008). Scientific aim: The essential aim of this study is to describe the way the process cut defines a productive process and non-productive process, in accordance with the PAPRIS methodology using the specific example. While the triggering mechanism of the project production process is an event causing its own production - i.e. the specific output with added value for the customer, the project of non-productive process is caused by the project management event. Therefore, it is caused by the need to control, monitor, track, inspect, evaluate outputs, decide and regulate the project implementation. Findings: Within the support of the communication process, two examples were used to verify the methodology. The global perspective on the process was created in ARIS tools and the communication between the call centre and the client was made in Visio tools. The PAPRIS methodology is based on the concept of process variability, which has been clearly formulated. The fundamental direction of the process development, anticipated changes and the opportunity to react to them in accordance with defined objectives of the PAIS project are guaranteed.


Author(s):  
Peter Haried

This study of international information systems (IS) offshoring highlights the idea that project success or failure is often in the eye of the beholder and that proper attention needs to be provided to both client and vendor perspectives. This research contributes by identifying noteworthy IS offshoring challenges faced by client and vendor stakeholders. This research synthesizes key findings from eight dyadic case studies consisting of 56 interviews in total from both client and vendor firms detailing their offshore experiences. The case investigations lead to the discovery of nine unique challenges encountered by client and vendor stakeholders. The challenges include a wide assortment of economic, personal responsibilities/expectations, and organizational offshore project management issues. The reported challenges can suitably guide client and vendor project managers in managing international IS offshore projects as well guide academic researchers to better understand techniques for managing offshore IS projects.


2013 ◽  
pp. 1253-1278
Author(s):  
Martin L. Bariff

Many project deliverables extend beyond a product or a service for sale to customers. The deliverable may include a new or a revised process for internal workflow or relations with customers, suppliers, or partners. The success of these projects will depend upon adoption of the new or revised process in addition to typical metrics for cost, schedule, risk, and quality. The project manager and team will be responsible for “managing organizational change”—a skillset that is not addressed within the Project Management Institute Body of Knowledge. The purpose of this chapter is to provide sufficient knowledge about approaches and implementation for organizational change to achieve total project success. Case studies are included to illustrate best practices and lessons learned.


2013 ◽  
pp. 715-760
Author(s):  
Andrew Goldenberg

This chapter provides an experience-based framework of prototypes development and commissioning. It introduces elements learned directly from the practice that encompass aspects of project management, technology development process, and commercialization in the context of Small and Medium Enterprises (SMEs). The contents of this chapter are based mainly on the author’s practical experience of leading an SME technology developer. The author is also a faculty member working as a researcher and teacher. Because of the interrelationship between research and technology development, his views and perception of the topic may be unique, and they are personal. The chapter presents a general framework for robotic systems prototyping. To back up the points made in the chapter, three case studies of robotic prototyping are included to help the reader perceive the outlined concepts.


2016 ◽  
pp. 865-881
Author(s):  
Bilal Ahmed Chaudhry

Project management is the use of different techniques to deliver project with meeting required objectives within defined constraints. Corporate strategy is plan by which organizations aspire to achieve organizational business goals. In recent times, project management is also used to achieve organizational goals by aligning project management with business strategy of an organization. This research is carried to explore the effects of aligning project management with business strategy on projects and organizations. Case studies were carried out in three organizations; one from public sector; one from private and one from semi-government organization. Results of this research revealed that alignment of business strategy with project management is beneficial for both organization and projects especially in terms of organizational growth and project success.


2009 ◽  
pp. 2442-2460
Author(s):  
John Gómez ◽  
Alejandro Núñez

This chapter introduces agile project management as a way to improve the processes for software development in small organizations. The chapter contains a description of the main concepts and techniques used along with practical recommendations for their application in real situations. The chapter also analyzes the relationship between these practices and recognized process improvement models like the CMMI and the PMI PMBOK and presents case studies to illustrate implementation.


Sign in / Sign up

Export Citation Format

Share Document