Selecting packaging material for dry food products by trade‐off of sustainability and performance: A case study on cookies and milk powder

2021 ◽  
Vol 34 (5) ◽  
pp. 303-318
Author(s):  
Maarten Baele ◽  
An Vermeulen ◽  
Dimitri Adons ◽  
Roos Peeters ◽  
Angelique Vandemoortele ◽  
...  
2015 ◽  
Vol 3 (2) ◽  
pp. 55
Author(s):  
Norol Hamiza Zamzuri ◽  
Khairil Wahidin Awang ◽  
Yuhanis Abdul Aziz ◽  
Zaiton Samdin

The growth of the event sector is underpinned by the demand of organizing a business event.  Thus, it leads to an increase in economic and social impact. However, the problems from the growth of this sector potentially results from the use of several event materials, transportation and infrastructure development.  Organizing a green event is seen as one of the strategies to reduce the environmental impact.  Therefore, the aim of this paper is to explore the issues involved throughout the process of greening an event by applying Mair and Jago Model.  Semi-structured interviews were conducted with event managers from six Malaysia business event companies that encourage green practices during their event.  Findings suggest that impact, initiative, support and performance motivates event organizers in organizing a green event.  It has also been found that knowledge, resources and behaviour are the barriers faced by event organizers throughout the process of organizing a green event.  Based on the findings it appears that two important factors have emerged from the data collection and analysis that showed a deviation from the Mair and Jago Model, namely “impact” for the motivation element and “support” for the barrier element.  The main limitation of this study was the scope of the study; as it only focuses on business events.  However, as the main purpose of this study is to explore the issues of organizing a green event, it has been found that there are other issues need to be explored in other contexts and geographical area.  Apart from this, as this is a case study, it can only replicate according to the circumstances of this case study. However, this study can be generalized in terms of the theory that has emerged from it.  It is suggested that further research should explore more issues in other contexts and geographical areas. 


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2021 ◽  
Vol 18 (2) ◽  
pp. 1-24
Author(s):  
Nhut-Minh Ho ◽  
Himeshi De silva ◽  
Weng-Fai Wong

This article presents GRAM (<underline>G</underline>PU-based <underline>R</underline>untime <underline>A</underline>daption for <underline>M</underline>ixed-precision) a framework for the effective use of mixed precision arithmetic for CUDA programs. Our method provides a fine-grain tradeoff between output error and performance. It can create many variants that satisfy different accuracy requirements by assigning different groups of threads to different precision levels adaptively at runtime . To widen the range of applications that can benefit from its approximation, GRAM comes with an optional half-precision approximate math library. Using GRAM, we can trade off precision for any performance improvement of up to 540%, depending on the application and accuracy requirement.


Author(s):  
A. Paulsen ◽  
H. Dumlu ◽  
D. Piorunek ◽  
D. Langenkämper ◽  
J. Frenzel ◽  
...  

AbstractTi75Ta25 high-temperature shape memory alloys exhibit a number of features which make it difficult to use them as spring actuators. These include the high melting point of Ta (close to 3000 °C), the affinity of Ti to oxygen which leads to the formation of brittle α-case layers and the tendency to precipitate the ω-phase, which suppresses the martensitic transformation. The present work represents a case study which shows how one can overcome these issues and manufacture high quality Ti75Ta25 tensile spring actuators. The work focusses on processing (arc melting, arc welding, wire drawing, surface treatments and actuator spring geometry setting) and on cyclic actuator testing. It is shown how one can minimize the detrimental effect of ω-phase formation and ensure stable high-temperature actuation by fast heating and cooling and by intermediate rejuvenation anneals. The results are discussed on the basis of fundamental Ti–Ta metallurgy and in the light of Ni–Ti spring actuator performance.


Sign in / Sign up

Export Citation Format

Share Document