The Technical State Evaluation and Protection Measures Development for the Refectory Chamber Building with the Church of the National Kyiv-Pechersk Reserve
2012 ◽
Vol 178-181
◽
pp. 2285-2289
2014 ◽
Vol 617
◽
pp. 136-141
◽
Keyword(s):
2021 ◽
Vol 28
(1)
◽
pp. 106-117
2018 ◽
Vol 3
(9)
◽
pp. 55-61
2017 ◽
Vol 232
(1)
◽
pp. 62-78
◽
2020 ◽