Prediction of Site Characterization Based on Field Investigations and Empirical Correlations

Author(s):  
Elena-Andreea Călăraşu ◽  
Cristian Arion ◽  
Cristian Neagu
Author(s):  
Hans Henning Dette ◽  
Alfred Führböter
Keyword(s):  

2004 ◽  
Vol 12 (2) ◽  
pp. 115-125
Author(s):  
Katrin Batereau ◽  
Martin Müller ◽  
Norbert Klaas ◽  
Baldur Barczewski

Author(s):  
Andrew J. Graettinger ◽  
Thanaporn Supriyasilp ◽  
S. Rocky Durrans

Author(s):  
Brian Chadwick ◽  
Adam A. Garde ◽  
John Grocott ◽  
Ken J.W. McCaffrey ◽  
Mike A. Hamilton

NOTE: This article was published in a former series of GEUS Bulletin. Please use the original series name when citing this article, for example: Chadwick, B., Garde, A. A., Grocott, J., McCaffrey, K. J., & Hamilton, M. A. (2000). Ketilidian structure and the rapakivi suite between Lindenow Fjord and Kap Farvel, South-East Greenland. Geology of Greenland Survey Bulletin, 186, 50-59. https://doi.org/10.34194/ggub.v186.5215 _______________ The southern tip of Greenland is underlain by the Palaeoproterozoic Ketilidian orogen (e.g. Chadwick & Garde 1996; Garde et al. 1998a). Field investigations in the summer of 1999 were focused on the structure of migmatites (metatexites) and garnetiferous granites (diatexites) of the Pelite Zone in the coastal region of South-East Greenland between Lindenow Fjord and Kap Farvel (Figs 1, 2). Here, we first address the tectonic evolution in the Pelite Zone in that region and its correlation with that in the Psammite Zone further north. Then, the structure and intrusive relationships of the rapakivi suite in the Pelite Zone are discussed, including particular reference to the interpretation of the controversial outcrop on Qernertoq (Figs 2, 8). Studies of the structure of the north-eastern part of the Julianehåb batholith around Qulleq were continued briefly from 1998 but are not addressed here (Fig. 1; Garde et al. 1999). The field study was keyed to an interpretation of the Ketilidian orogen as a whole, including controls of rates of thermal and tectonic processes in convergent settings. Earlier Survey field work (project SUPRASYD, 1992–1996) had as its principal target an evaluation of the economic potential of the orogen (Nielsen et al. 1993). Ensuing plate-tectonic studies were mainly funded in 1997–1998 by Danish research foundations and in 1999 by the Natural Environment Research Council, UK. The five-week programme in 1999 was seriously disrupted by bad weather, common in this part of Greenland, and our objectives were only just achieved. Telestation Prins Christian Sund was the base for our operations (Fig. 2), which were flown with a small helicopter (Hughes MD-500).


2017 ◽  
Vol 68 (3) ◽  
pp. 581-585 ◽  
Author(s):  
Gabriela Oprina ◽  
Ladislau Radermacher ◽  
Daniel Lingvay ◽  
Dorian Marin ◽  
Andreea Voina ◽  
...  

The corrosion state of an underground metallic pipeline of �161 mm and 565 m length was assessed by specific electrical and electrochemical measurements. The investigated pipe, buried in 1997, was protected against corrosion by successive layers of bituminous material with a total thickness of 1 to 1.2 mm. The pipeline crosses three electrified railway lines (50 Hz - 28 kV), and then its route is approximately parallel to these lines; thus, the induced AC voltages between line and ground were calculated obtaining values between 4.05 and 7.1 Vrms, in good agreement with the values measured in the accessible points. The measurements regarding the insulation capacity against corrosion of the bituminous insulation, performed at one month and after 19 years of burial, showed an increase of the average cathode current density needed for obtaining the protection potential in the range �1.00 � �1.28 VCu/CuSO4 of approx. three times (from 6.65 up to 19.96 mA/m2), in good agreement with the evolution of the insulation resistance measured between the steel pipe (having a contact area with the ground of 270.5 m2) and a ground socket of 4 W, which decreased from 995 to 315 kW. Following the analysis and processing of the field collected data, it is considered that, by implementing a cheap cathodic protection system (without cathodic current power supply), based on the rectification of the AC induced voltage, the safe operation period of the investigated pipeline may be extended by at least 50 years.


Sign in / Sign up

Export Citation Format

Share Document