Three-Pass (DInSAR) Ground Change Detection in Sukari Gold Mine, Eastern Desert, Egypt

Author(s):  
Sayed A. Mohamed ◽  
Ayman H. Nasr ◽  
Hatem M. Keshk
1986 ◽  
Vol 5 (5) ◽  
pp. 465-469 ◽  
Author(s):  
Ahmed M. El-Bouseily ◽  
Ahmed I. Arslan ◽  
Mohamed F. Ghoneim ◽  
Hassan Z. Harraz

2020 ◽  
Vol 8 (6) ◽  
pp. 1935-1940

This study aims to the examination of the economic potential for the Abu Marawat Gold Project (AGP) in the Eastern Desert of Egypt and prediction the decision about go/not-to-go to invest in the deposit location. Discount Cash Flow (DCF) model used to calculate the Net Present Value (NPV) for the proposed gold mine project. NPV calculated by taking the risk and uncertainty produced from geological and technical factors into account. The actual production and cost data for Sukari Gold Mine (SGM) of Egypt used a benchmark for the theoretical calculation for production and cost data of AGP. From the valuation processes for AGP the NPV for the project predominantly positive, so, the project is acceptable to investment.


2021 ◽  
Vol 09 (08) ◽  
pp. 129-139
Author(s):  
Mohamed A. El-Sadek ◽  
Ibrahim M. M. Al-Alfy ◽  
Hussein F. Abd El Salam ◽  
Mostafa A. M. Zaeimah

Sign in / Sign up

Export Citation Format

Share Document