New approach to estimating the contact strength of a concrete gravity dam with a rock foundation

1977 ◽  
Vol 11 (8) ◽  
pp. 795-800
Author(s):  
I. A. Baslavskii
2020 ◽  
Vol 38 (4) ◽  
pp. 4111-4127
Author(s):  
Ajay Rampal ◽  
Prasun Halder ◽  
Bappaditya Manna ◽  
K. G. Sharma

2021 ◽  
Vol 937 (4) ◽  
pp. 042048
Author(s):  
G I Sidorenko ◽  
M A Demyanova

Abstract Multivariate water-power calculations were carried out and the main parameters of the reservoired Gilyuyskaya HPP were justified. The Gilyuy river is located in the Amur Region of the Far Eastern Federal District and is a right tributary of the Zeya River. The mouth of the Gilyuy river is located above the power site of Zeyskaya HPP. Based on the water-power calculations, it was found that the most efficient way is to use live storage capacity of 3.13 km3 and the turbine flow rate of HPP equal to 268 m3/s. The installed power capacity of Giluyskaya HPP is justified on the basis of maximizing the net present value and is assumed to be 213 MW. Hydropower has three hydraulic units with radial-axial turbine RO115with impeller diameter of 3.35 m and synchronous speed of 214.3rpm.The high-head water power development includes as follows: a concrete gravity dam, a concrete spillway dam with nappe-shaped profile, a concrete power dam with three water inlets and three steel pipelines with a diameter of 4 m, as well as HPP building. The HPP building is 48.68 m long and consists of three hydropower units with a width of 16.23 m. The length of the tent of HPP building along the flowstream is 18.5 m. The assembly area is 24.34 m long.


2018 ◽  
Vol 9 (5) ◽  
pp. 181
Author(s):  
Machach Laila ◽  
Mouzzoun Mouloud ◽  
Moustachi Oum El Khaiat ◽  
Taleb Ali

Sign in / Sign up

Export Citation Format

Share Document