A multi-objective memetic algorithm for integrated process planning and scheduling

2015 ◽  
Vol 85 (5-8) ◽  
pp. 1513-1528 ◽  
Author(s):  
Liangliang Jin ◽  
Chaoyong Zhang ◽  
Xinyu Shao ◽  
Xudong Yang ◽  
Guangdong Tian
Processes ◽  
2019 ◽  
Vol 7 (3) ◽  
pp. 120 ◽  
Author(s):  
Liangliang Jin ◽  
Chaoyong Zhang ◽  
Xinjiang Fei

The integration of scheduling and process planning can eliminate resource conflicts and hence improve the performance of a manufacturing system. However, the focus of most existing works is mainly on the optimization techniques to improve the makespan criterion instead of more efficient uses of energy. In fact, with a deteriorating global climate caused by massive coal-fired power consumption, carbon emission reduction in the manufacturing sector is becoming increasingly imperative. To ease the environmental burden caused by energy consumption, e.g., coal-fired power consumption in use of machine tools, this research considers both makespan as well as environmental performance criteria, e.g., total power consumption, in integrated process planning and scheduling using a novel multi-objective memetic algorithm to facilitate a potential amount of energy savings; this can be realized through a better use of resources with more efficient scheduling schemes. A mixed-integer linear programming (MILP) model based on the network graph is formulated with both makespan as well as total power consumption criteria. Due to the complexity of the problem, a multi-objective memetic algorithm with variable neighborhood search (VNS) technique is then developed for this problem. The Kim’s benchmark instances are employed to test the proposed algorithm. Moreover, the TOPSIS decision method is used to determine the most satisfactory non-dominated solution. Several scenarios are considered to simulate different machine automation levels and different machine workload levels. Computational results show that the proposed algorithm can strike a balance between the makespan criterion and the total power consumption criterion, and the total power consumption can be affected by machine tools with different automation levels and different workloads. More importantly, results also show that energy saving can be realized by completing machining as early as possible on a machine tool and taking advantage of machine flexibility.


2020 ◽  
Vol 17 (3) ◽  
pp. 172988142092523 ◽  
Author(s):  
Xiaoyu Wen ◽  
Xinyu Li ◽  
Liang Gao ◽  
Kanghong Wang ◽  
Hao Li

The new technology of intelligent manufacturing makes the data of process planning and shop scheduling easier to interconnect, and the integration optimization of different manufacturing processes is an important technology to ensure the implementation of intelligent manufacturing. Integrated process planning and scheduling is a significant research focus in recent years, which could improve the performance of manufacturing system. At present, the research on integrated process planning and scheduling is insufficient to consider the multi-objective and uncertain characteristics widely existing in real manufacturing environment. Therefore, multi-objective integrated process planning and scheduling problem with uncertain processing time and due date is addressed in this article. The mathematical model of multi-objective uncertain integrated process planning and scheduling problem with uncertain processing time and fuzzy due date is established based on fuzzy set, in which the calculation method of uncertainty measurement objective is designed. An effective modified honey bees mating optimization algorithm has been designed to solve the proposed model. Queens set is constructed to maintain the non-dominated solutions found in the optimization process. The calculation method of mating probability between drone and queen bee based on Euclidean distance is designed. Fuzzy operators were utilized to evaluate fitness, judge the non-dominated relationship, and decode the scheduling solution. Different instances were designed and carried out to test the performance of the proposed method. The results show that the proposed method is very effective for solving multi-objective uncertain integrated process planning and scheduling.