scholarly journals A New Process Quality-based Multi-objective Multi-part Approach for the Integrated Process Planning and Scheduling (IPPS) Problem in Reconfigurable Manufacturing Environment

2020 ◽  
Vol 53 (2) ◽  
pp. 10755-10760
Author(s):  
Luca Morganti ◽  
Hichem Haddou Benderbal ◽  
Lyes Benyoucef ◽  
Marco Bortolini ◽  
Francesco Gabriele Galizia
2020 ◽  
Vol 17 (3) ◽  
pp. 172988142092523 ◽  
Author(s):  
Xiaoyu Wen ◽  
Xinyu Li ◽  
Liang Gao ◽  
Kanghong Wang ◽  
Hao Li

The new technology of intelligent manufacturing makes the data of process planning and shop scheduling easier to interconnect, and the integration optimization of different manufacturing processes is an important technology to ensure the implementation of intelligent manufacturing. Integrated process planning and scheduling is a significant research focus in recent years, which could improve the performance of manufacturing system. At present, the research on integrated process planning and scheduling is insufficient to consider the multi-objective and uncertain characteristics widely existing in real manufacturing environment. Therefore, multi-objective integrated process planning and scheduling problem with uncertain processing time and due date is addressed in this article. The mathematical model of multi-objective uncertain integrated process planning and scheduling problem with uncertain processing time and fuzzy due date is established based on fuzzy set, in which the calculation method of uncertainty measurement objective is designed. An effective modified honey bees mating optimization algorithm has been designed to solve the proposed model. Queens set is constructed to maintain the non-dominated solutions found in the optimization process. The calculation method of mating probability between drone and queen bee based on Euclidean distance is designed. Fuzzy operators were utilized to evaluate fitness, judge the non-dominated relationship, and decode the scheduling solution. Different instances were designed and carried out to test the performance of the proposed method. The results show that the proposed method is very effective for solving multi-objective uncertain integrated process planning and scheduling.


2015 ◽  
Vol 85 (5-8) ◽  
pp. 1513-1528 ◽  
Author(s):  
Liangliang Jin ◽  
Chaoyong Zhang ◽  
Xinyu Shao ◽  
Xudong Yang ◽  
Guangdong Tian

Energies ◽  
2020 ◽  
Vol 13 (23) ◽  
pp. 6181
Author(s):  
Xu Zhang ◽  
Hua Zhang ◽  
Jin Yao

With the emergence of the concept of green manufacturing, more manufacturers have attached importance to energy consumption indicators. The process planning and shop scheduling procedures involved in manufacturing processes can both independently achieve energy savings, however independent optimization approaches limit the optimization space. In order to achieve a better optimization effect, the optimization of energy savings for integrated process planning and scheduling (IPPS) was studied in this paper. A mathematical model for multi-objective optimization of IPPS was established to minimize the total energy consumption, makespan, and peak power of the job shop. A hierarchical multi-strategy genetic algorithm based on non-dominated sorting (NSHMSGA) was proposed to solve the problem. This algorithm was based on the non-dominated sorting genetic algorithm Ⅱ (NSGA-Ⅱ) framework, in which an improved hierarchical coding method is used, containing a variety of genetic operators with different strategies, and in which a population degradation mechanism based on crowding distance is adopted. The results from the case study in this paper showed that the proposed method reduced the energy consumption by approximately 15% for two different scheduling schemes with the same makespan. The computational results for NSHMSGA and NSGA-Ⅱ approaches were evaluated quantitatively in the case study. The C-metric values for NSHMSGA and NSGA-Ⅱ were 0.78 and 0, the spacing metric values were 0.4724 and 0.5775, and the maximum spread values were 1.6404 and 1.3351, respectively. The evaluation indexes showed that the NSHMSGA approach could obtain a better non-dominated solution set than the NSGA-Ⅱ approach in order to solve the multi-objective IPPS problem proposed in this paper.


Sign in / Sign up

Export Citation Format

Share Document