Systematic analysis of the operational response of activated sludge process to variable wastewater flows. A case study

2002 ◽  
Vol 4 (3) ◽  
pp. 183-190 ◽  
Author(s):  
D. Giokas ◽  
A. Vlessidis ◽  
M. Angelidis ◽  
G. Tsimarakis ◽  
M. Karayannis
2020 ◽  
Vol 90 ◽  
pp. 51-58 ◽  
Author(s):  
Vanesa Benito ◽  
Javier Etxebarria ◽  
Felipe Goñi-de-Cerio ◽  
Iñigo Gonzalez ◽  
Pilar Brettes ◽  
...  

2004 ◽  
Vol 50 (7) ◽  
pp. 147-155 ◽  
Author(s):  
S. Winkler ◽  
N. Natsché ◽  
T. Gamperer ◽  
M. Dum

The sewage-load variations in winter tourism areas are characterized by sudden increases - in the ange of a factor two to three - within only a few days at the start and the end of the tourist season, especially at Christmas. The sudden load increases occur during periods of low wastewater temperatures, which is an additional demanding factor with respect to nitrogen removal. A full case study was carried out at WWTP Saalfelden, which is located near one of Austria's largest skiing resorts. The plant is designed for 80,000 PE and built according to the HYBRID®-concept, which is a special two stage activated sludge process for extensive nutrient removal.


Sign in / Sign up

Export Citation Format

Share Document