scholarly journals Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times

Author(s):  
Hanane Krim ◽  
Nicolas Zufferey ◽  
Jean-Yves Potvin ◽  
Rachid Benmansour ◽  
David Duvivier

AbstractWe consider in this work a bicriteria scheduling problem on two different parallel machines with a periodic preventive maintenance policy. The two objectives considered involve minimization of job rejection costs and weighted sum of completion times. They are handled through a lexicographic approach, due to a natural hierarchy among the two objectives in the applications considered. The main contributions of this paper are first to present a new problem relevant to practice, second, to develop a mixed-integer-linear-program model for the problem, and third, to introduce two generalizable tabu-search metaheuristics relying on different neighborhood structures and solution spaces. Computational results for 120 instances (generated from a real case) are reported to empirically demonstrate the effectiveness of the proposed metaheuristics.

Author(s):  
J. Behnamian ◽  
S.M.T. Fatemi Ghomi

This paper introducesa multi-factory scheduling problem with heterogeneous factories and parallel machines. This problem, as a major part of supply chain planning, includes the finding of suitable factory for each job and the scheduling of the assigned jobs at each factory, simultaneously. For the first time, this paper studies multi-objective scheduling in the production network in which each factory has its customers and demands can be satisfied by itself or other factories. In other words, this paper assumes that jobs can transfer from the overloaded machine in the origin factory to the factory which has fewer workloads by imposing some transportation times. For simultaneous minimization of the sum of the earliness and tardiness of jobs and total completion time, after modeling the scheduling problem as a mixed-integer linear program, the existing multi-objective techniques are analyzed and a new one is applied to our problem. Since this problem is NP-hard, a heuristic algorithm is also proposed to generate a set of Pareto optimal solutions. Also, the algorithms are proposed to improve and cover the Pareto front. Computational experiences of the heuristic algorithm and the output of the model implemented by CPLEX over a set of randomly generated test problems are reported.


2019 ◽  
Vol 75 (1) ◽  
pp. 291-320 ◽  
Author(s):  
Hanane Krim ◽  
Rachid Benmansour ◽  
David Duvivier ◽  
Daoud Aït-Kadi ◽  
Said Hanafi

Author(s):  
Shubin Xu ◽  
John Wang

A major challenge faced by hospitals is to provide efficient medical services. The problem studied in this article is motivated by the hospital sterilization services where the washing step generally constitutes a bottleneck in the sterilization services. Therefore, an efficient scheduling of the washing operations to reduce flow time and work-in-process inventories is of great concern to management. In the washing step, different sets of reusable medical devices may be washed together as long as the washer capacity is not exceeded. Thus, the washing step is modeled as a batch scheduling problem where washers have nonidentical capacities and reusable medical device sets have different sizes and different ready times. The objective is to minimize the sum of completion times for washing operations. The problem is first formulated as a nonlinear integer programming model. Given that this problem is NP-hard, a genetic algorithm is then proposed to heuristically solve the problem. Computational experiments show that the proposed algorithm is capable of consistently obtaining high-quality solutions in short computation times.


2009 ◽  
Vol 26 (06) ◽  
pp. 817-829 ◽  
Author(s):  
XIAOFENG HU ◽  
JINGSONG BAO ◽  
YE JIN

This paper focuses on scheduling problem of a pipe-processing flowshop in a shipyard. The flowshop composes of five stages, including cutting, bending, welding preprocessing, argon-welding and CO 2-welding, and each stage consists of identical parallel machines. Since thousands of pipes are mounted on the hull block before erection, the pipe-processing scheduling is a critical task for shipbuilding to meet the due date of the block erection. A tabu search algorithm is developed for the scheduling problem with the objective of minimizing total tardiness. Computational experiments are performed on the collected real data. Results show that the proposed algorithm is efficient for this problem.


2012 ◽  
Vol 2012 ◽  
pp. 1-20 ◽  
Author(s):  
Wenming Cheng ◽  
Peng Guo ◽  
Zeqiang Zhang ◽  
Ming Zeng ◽  
Jian Liang

In many real scheduling environments, a job processed later needs longer time than the same job when it starts earlier. This phenomenon is known as scheduling with deteriorating jobs to many industrial applications. In this paper, we study a scheduling problem of minimizing the total completion time on identical parallel machines where the processing time of a job is a step function of its starting time and a deteriorating date that is individual to all jobs. Firstly, a mixed integer programming model is presented for the problem. And then, a modified weight-combination search algorithm and a variable neighborhood search are employed to yield optimal or near-optimal schedule. To evaluate the performance of the proposed algorithms, computational experiments are performed on randomly generated test instances. Finally, computational results show that the proposed approaches obtain near-optimal solutions in a reasonable computational time even for large-sized problems.