scholarly journals Scheduling in parallel machines with two objectives: analysis of factors that influence the Pareto frontier

Author(s):  
Julio Mar-Ortiz ◽  
Alex J. Ruiz Torres ◽  
Belarmino Adenso-Díaz

AbstractThis paper explores the characteristics of solutions when scheduling jobs in a shop with parallel machines. Three classical objective functions were considered: makespan, total completion time, and total tardiness. These three criteria were combined in pairs, resulting in three bi-objective formulations. These formulations were solved using the ε-constraint method to obtain a Pareto frontier for each pair. The objective of the research is to evaluate the Pareto set of efficient schedules to characterize the solution sets. The characterization of the solutions sets is based on two performance metrics: the span of the objective functions' values for the points in the frontier and their closeness to the ideal point. Results that consider four experimental factors indicate that when the makespan is one of the objective functions, the range of the processing times among jobs has a significant influence on the characteristics of the Pareto frontier. Simultaneously, the slack of due dates is the most relevant factor when total tardiness is considered.

Author(s):  
John G. Michopoulos ◽  
Tomonari Furukawa ◽  
John C. Hermanson ◽  
Samuel G. Lambrakos

A hierarchical algorithmic and computational scheme based on a staggered design optimization approach is presented. This scheme is structured for unique characterization of many continuum systems and their associated datasets of experimental measurements related to their response characteristics. This methodology achieves both online (real-time) and offline design of optimum experiments required for characterization of the material system under consideration, while also achieving a constitutive characterization of the system. The approach assumes that mechatronic systems are available for exposing specimens to multidimensional loading paths and for the acquisition of data associated with stimulus and response behavior. Material characterization is achieved by minimizing the difference between system responses that are measured experimentally and predicted based on model representation. The performance metrics of the material characterization process are used to construct objective functions for the design of experiments at a higher-level optimization. The distinguishability and uniqueness of solutions that characterize the system are used as two of many possible measures adopted for construction of objective functions required for design of experiments. Finally, a demonstration of the methodology is presented that considers the best loading path of a two degree-of-freedom loading machine for characterization of the linear elastic constitutive response of anisotropic materials.


2012 ◽  
Vol 472-475 ◽  
pp. 2279-2282
Author(s):  
Hong Bing Yang ◽  
Wen Chao Li ◽  
Xian Ping Guan ◽  
Fei Zhou

In this paper, we address unrelated parallel machines scheduling problem with fuzzy processing times considering the minimization of the total tardiness cost. The tardiness credibility index of jobs is given to estimate the possibility of job’s tardiness, and a mixed integer programming model (MIP) is formulated for total tardiness cost based on fuzzy theory. Solving the MIP problem is NP-hard, thus a tabu search is designed to solve such a difficult problem. The results of computational test show the feasibility and effectiveness of the developed model and algorithm.


Author(s):  
PENG-JEN LAI ◽  
HSIEN-CHUNG WU

The scheduling problems with fuzzy processing times and fuzzy due dates are investigated in this paper. The concepts of earliness and tardiness are interpreted by using the concepts of possibility and necessity measures that were developed in fuzzy sets theory. Many types of objective function will be taken into account through the different combinations of possibility and necessity measures. The purpose of this paper is to obtain the optimal schedules based on these objective functions. The genetic algorithm will be invoked to tackle these objective functions. Four numerical examples are also provided and solved by using the commercial software MATLAB.


2020 ◽  
pp. 17-33
Author(s):  
Javad Rezaeian ◽  
Samir Mohammad-Hosseini ◽  
Sara Zabihzadeh ◽  
Keyvan Shokoufi

This paper deals with unrelated parallel machines scheduling problem with sequence dependent setup times under fully fuzzy environment to minimize total weighted fuzzy earliness and tardiness penalties, which belongs to NP-hard class. Due to inherent uncertainty in Processing times, setup times and due dates of jobs, they are considered here with triangular and trapezoidal fuzzy numbers in order to take into account the unpredictability of parameters in practical settings. Although this study is not the first one to study on fuzzy parallel machines scheduling problem, it advances this area of research in three fields: (1) it selects a fuzzy environment to cover the whole area of the considered problem not just part of it, and also, it chooses an appropriate fuzzy method based on an in-depth investigation of the effect of spread of fuzziness on the variables; (2) It introduces a mathematical programming model for the addressed problem as an exact method; and (3) due to NP-hardness of the problem, it develops an existing algorithm in the literature for the considered problem through extensive simulated experiments and statistical tests on the same benchmark problem test by proposing a genetic algorithm (GA) and a modified simulated annealing (SA) methods to solve this hard combinatorial optimization problem. The result shows the superiority of our modified SA.


2015 ◽  
Vol 2015 ◽  
pp. 1-11 ◽  
Author(s):  
Jae-Gon Kim ◽  
Seung-Kil Lim ◽  
June-Young Bang

Lot-order assignment is to assign items in lots being processed to orders to fulfill the orders. It is usually performed periodically for meeting the due dates of orders especially in a manufacturing industry with a long production cycle time such as the semiconductor manufacturing industry. In this paper, we consider the lot-order assignment problem (LOAP) with the objective of minimizing the total tardiness of the orders with distinct due dates. We show that we can solve the LOAP optimally by finding an optimal sequence for the single-machine total tardiness scheduling problem with nonnegative time-dependent processing times (SMTTSP-NNTDPT). Also, we address how the priority rules for the SMTTSP can be modified to those for the SMTTSP-NNTDPT to solve the LOAP. In computational experiments, we discuss the performances of the suggested priority rules and show the result of the proposed approach outperforms that of the commercial optimization software package.


Author(s):  
Satish Kodali ◽  
Chen Zhe ◽  
Chong Khiam Oh

Abstract Nanoprobing is one of the key characterization techniques for soft defect localization in SRAM. DC transistor performance metrics could be used to identify the root cause of the fail mode. One such case report where nanoprobing was applied to a wafer impacted by significant SRAM yield loss is presented in this paper where standard FIB cross-section on hard fail sites and top down delayered inspection did not reveal any obvious defects. The authors performed nanoprobing DC characterization measurements followed by capacitance-voltage (CV) measurements. Two probe CV measurement was then performed between the gate and drain of the device with source and bulk floating. The authors identified valuable process marginality at the gate to lightly doped drain overlap region. Physical characterization on an inline split wafer identified residual deposits on the BL contacts potentially blocking the implant. Enhanced cleans for resist removal was implemented as a fix for the fail mode.