Experimental study on the natural circulation of a passive residual heat removal system for an integral reactor following a safety related event

2008 ◽  
Vol 35 (12) ◽  
pp. 2249-2258 ◽  
Author(s):  
Hyun-Sik Park ◽  
Ki-Yong Choi ◽  
Seok Cho ◽  
Sung-Jae Yi ◽  
Choon-Kyung Park ◽  
...  
2021 ◽  
Vol 140 ◽  
pp. 103929
Author(s):  
Qianhua Su ◽  
Haiyan Xu ◽  
Donghua Lu ◽  
Xiaohang Wu ◽  
Xi Yao ◽  
...  

2014 ◽  
Vol 986-987 ◽  
pp. 231-234
Author(s):  
Jun Teng Liu ◽  
Qi Cai ◽  
Xia Xin Cao

This paper regarded CNP1000 power plant system as the research object, which is the second-generation half Nuclear Reactor System in our country, and tried to set Westinghouse AP1000 passive residual heat removal system to the primary circuit of CNP1000. Then set up a simulation model based on RELAP5/MOD3.2 program to calculate and analyze the response and operating characteristic of passive residual heat removal system on assumption that Station Blackout occurs. The calculation has the following conclusions: natural circulation was quickly established after accident, which removes core residual heat effectively and keep the core safe. The residual heat can be quickly removed, and during this process the actual temperature was lower than saturation temperature in reactor core.


2016 ◽  
Vol 53 (9) ◽  
pp. 1385-1396 ◽  
Author(s):  
Ayako Ono ◽  
Hideki Kamide ◽  
Jun Kobayashi ◽  
Norihiro Doda ◽  
Osamu Watanabe

2021 ◽  
Vol 2021 ◽  
pp. 1-6
Author(s):  
Feng Li ◽  
Yazhe Lu ◽  
Xiao Chu ◽  
Qiang Zheng ◽  
Guanghao Wu

In response to a station blackout accident similar to the Fukushima nuclear accident, China’s Generation III nuclear power HPR1000 designed and developed a passive residual heat removal system connected to the secondary side of the steam generator. Based on the two-phase natural circulation principle, the system is designed to bring out long-term core residual heat after an accident to ensure that the reactor is in a safe state. The steady-state characteristic test and transient start and run test of the PRS were carried out on the integrated experiment bench named ESPRIT. The experiment results show that the PRS can establish natural circulation and discharge residual heat of the first loop. China’s Fuqing no. 5 nuclear power plant completed the installation of the PRS in September 2019 and carried out commissioning work in October. This debugging is the first real-world debugging of the new design. This paper introduces the design process of the PRS debugging scheme.


Sign in / Sign up

Export Citation Format

Share Document