Integration of absorption cooling systems into micro gas turbine trigeneration systems using biogas: Case study of a sewage treatment plant

2009 ◽  
Vol 86 (6) ◽  
pp. 837-847 ◽  
Author(s):  
Joan Carles Bruno ◽  
Víctor Ortega-López ◽  
Alberto Coronas
Energies ◽  
2019 ◽  
Vol 12 (12) ◽  
pp. 2424 ◽  
Author(s):  
Chia-Chi Chang ◽  
Manh Van Do ◽  
Wei-Li Hsu ◽  
Bo-Liang Liu ◽  
Ching-Yuan Chang ◽  
...  

Combined heat and power production from biogas is now playing an important role in energy and resource utilization as well as pollution control in waste water treatment. This research used biogas from the Bali Sewage Treatment Plant in New Taipei City, Taiwan, as a major source of fuel for the electricity generation. A micro gas turbine electricity generator, Capstone CR-30, which possesses a maximum rated power load (PWL) of 30 kW, was equipped to convert biogas into electricity. The biogas is mainly composed of CH4 (56.1 ± 8.0 vol.%), CO2 (25.5 ± 9.8 vol.%), H2 (0.5 vol.%), and H2S (0.99 ± 0.07 ppmv). During the test operation period of the generator, it was found that the thermal efficiency increases from 19.8% to 23.4% kWhe/kWhth, while the electricity generation efficiency (ηEB) also rises from 0.93 to 1.09 kWhe/m3 biogas as the PWL increases from 10 kW to 30 kW. The results indicated that the generator has a better performance with higher PWL. At PWL = 30 kW, the average adjusted concentrations of CO and NOx (adjusted to 15 vol.% O2) emitted from the generator are 86 ppmv and 17 ppmv, respectively. Both are much lower than the emission standards of stationary sources in Taiwan of 2000 ppmv and 150 ppmv, respectively. Thus, PWL of 30 kW was selected in cooperation with biogas inflow = 0.412 m3/min and air/fuel ratio (i.e., air/biogas ratio) = 76.0 vol./vol. for the long-term regular operation. At the above setting conditions for long-term operation, the generator continuously consumed the biogas and provided stable electricity generation at a rate of 19.64 kWhe/h for a 2-year running period. Moreover, the greenhouse gas can be cut off with a rate of 10.78 kg CO2e/h when using biogas as fuel for electricity generation. Overall, this research proves that the application of a micro gas turbine electricity generator not only has promising performance for using biogas but also gives a significant reduction of greenhouse gas emission, which fits the concepts of the circular economy and environmental protection.


2011 ◽  
Vol 94-96 ◽  
pp. 2325-2328
Author(s):  
Li Xin Li ◽  
Hong Zhen Li ◽  
Yu Bing Duan ◽  
Xu Wang

The integrative fuzzy set pair model, established by set pair analysis (SPA) and fuzzy hierarchy analysis, was introduced to pre-evaluation of security states in the construction stage. Two relevant sets, evaluation index and dangerous standard, were analyzed and calculated in terms of the identity, discrepancy and contradistinction[1]. The indices and weights were determined by Delphi and fuzzy hierarchy analysis respectively in order to establish the integrative fuzzy set pair model of construction stage. Finally, the model was applied to the case study of Shenyang sewage treatment plant and the results demonstrated that the method proposed in this present paper is satisfactory.


2009 ◽  
Vol 95 (1) ◽  
pp. 18-30 ◽  
Author(s):  
Kunwar P. Singh ◽  
Nikita Basant ◽  
Amrita Malik ◽  
Sarita Sinha ◽  
Gunja Jain

Sign in / Sign up

Export Citation Format

Share Document