A Case Study of Upgrading Project of Domestic Sewage Treatment Plant in the Minjiang and Tuojiang Basins

2021 ◽  
Vol 10 (02) ◽  
pp. 168-174
Author(s):  
凌云 辜
2017 ◽  
Vol 12 (1) ◽  
pp. 202-210 ◽  
Author(s):  
A. P. Rosa ◽  
A. V. Santos ◽  
A. D. U. C. Schmidt ◽  
J. M. Borges ◽  
C. A. L. Chernicharo

This paper aimed to evaluate the effectiveness of a device to remove scum from the inner part of gas-liquid-solid separators of a full-scale upflow anaerobic sludge blanket reactor treating domestic sewage, as well as determining the scum yield coefficient for different reactors’ operating conditions. The experiments were carried out at the Laboreaux sewage treatment plant (Itabira, Minas Gerais, Brazil) and the effectiveness of the scum removal device was fully demonstrated, with median efficiencies ranging from 65 to 90%. The average scum yield varied from 6.8 to 14.6 mL of scum formed per kg COD applied.


2014 ◽  
Vol 955-959 ◽  
pp. 3393-3399 ◽  
Author(s):  
Wei Zheng ◽  
Yan Ming Yang ◽  
Yun Long Li ◽  
Jian Qiu Zheng

The process technique and design parameters of project of Solar Ozonic Ecological Sewage Treatment Plant (short for SOESTP) which consists of anaerobic reactor, horizontal subsurface flow (HSSF) constructed wetlands(CWs) and the combination of solar power and ozone disinfection are described, the paper further examines the removal efficiency for treating rural domestic sewage, running expense and recycling ability of product water. The results show that the average percentage removal values of CODcr,BOD5,SS,TN,NH3-N,TP range from 95.6% to 98.0%, 96.0% to 98.7%, 93.1% to 96.1%, 97.0% to 98.9%, 96.9% to 99.5%, 98.2% to 99.6%, respectively, the reduction of fecal coliform (FC) reaches 99.9%, the effluent quality meets the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB18918-2002). The running cost of SOESTP is 0.063yuan/ m3, saves much more than traditional sewage treatment, and the ozone water obtained from the reservoir will be an ideal choice for disinfection .The system has characteristics of easy manipulation, low operating cost, achieving advanced water, energy conservation and environment protection, is thought to be very suitable for use as the promotion of rural small - scale sewage treatment.


2021 ◽  
Vol 766 (1) ◽  
pp. 012076
Author(s):  
Huang Jin ◽  
Zhang Xiaoxin ◽  
Sun Youfeng ◽  
Huang Xia ◽  
Wang Guanjun

1973 ◽  
Vol 2 (4) ◽  
pp. 473-482 ◽  
Author(s):  
J. C. Van Loon ◽  
J. Lichwa ◽  
D. Ruttan ◽  
J. Kinrade

2011 ◽  
Vol 94-96 ◽  
pp. 2325-2328
Author(s):  
Li Xin Li ◽  
Hong Zhen Li ◽  
Yu Bing Duan ◽  
Xu Wang

The integrative fuzzy set pair model, established by set pair analysis (SPA) and fuzzy hierarchy analysis, was introduced to pre-evaluation of security states in the construction stage. Two relevant sets, evaluation index and dangerous standard, were analyzed and calculated in terms of the identity, discrepancy and contradistinction[1]. The indices and weights were determined by Delphi and fuzzy hierarchy analysis respectively in order to establish the integrative fuzzy set pair model of construction stage. Finally, the model was applied to the case study of Shenyang sewage treatment plant and the results demonstrated that the method proposed in this present paper is satisfactory.


Sign in / Sign up

Export Citation Format

Share Document