scholarly journals Multi-process production scheduling with variable renewable integration and demand response

2020 ◽  
Vol 281 (1) ◽  
pp. 186-200 ◽  
Author(s):  
José Luis Ruiz Duarte ◽  
Neng Fan ◽  
Tongdan Jin
2015 ◽  
Vol 48 (8) ◽  
pp. 385-390 ◽  
Author(s):  
Chudong Tong ◽  
Nael H. El-Farra ◽  
Ahmet Palazoglu

2019 ◽  
Vol 15 (2) ◽  
pp. 942-953 ◽  
Author(s):  
Xu Gong ◽  
Ying Liu ◽  
Niels Lohse ◽  
Toon De Pessemier ◽  
Luc Martens ◽  
...  

Author(s):  
Miguel A. Peinado-Guerrero ◽  
Nicolas A. Campbell ◽  
Jesus R. Villalobos ◽  
Patrick E. Phelan

Abstract A framework is proposed for demand-side load management (DSLM) of manufacturers participating in demand response (DR) programs. Utilities are increasingly focused on enticing their portfolios of energy end-users to adjust their energy use patterns in a mutually beneficial manner such as with DR programs. DR programs allow the utility to receive bulk peak load reduction and the participating end-user to receive credit towards their electricity bills. Once an end-user is enrolled in a DR program, they receive periodic requests for some amount of load reduction, typically the day before. Failing to respond to a DR signal will usually cost the end-user handsomely. The end-user is often left to their own discretion on how to attain the level of load reduction requested by the utility. For a manufacturer, this means if the request in load reduction is high enough, they will need to figure out how to curtail production. On the other hand, if the load reduction requested is small enough to need no disruption to production, the utility may be missing out on untapped DR capabilities that could be offered from the ability of the manufacturer to reschedule their production. In either case, the availability of an optimal plan for the manufacturer to best schedule its production in response to a DR event can maximize the benefits for both parties. Most of the research found in literature addresses production scheduling with minimal energy use or cost with respect to a time-of-use price tariff. A system that communicates the desires of the utility to the end-user for a DR event and provides the end-user with support in the decision-making process remains to be developed. The framework proposed addresses these shortcomings, considering the introduction of IoT capabilities and the physical constraints of the manufacturer.


Engineering ◽  
2015 ◽  
Vol 1 (4) ◽  
pp. 422-435 ◽  
Author(s):  
David P. Chassin ◽  
Sahand Behboodi ◽  
Curran Crawford ◽  
Ned Djilali

Author(s):  
Rosnani Ginting ◽  
Chairul Rahmadsyah Manik

Penjadwalan merupakan aspek yang sangat penting karena didalamnya terdapat elemen perencanaan dan pengendalian produksi bagi suatu perusahaan yang dapat mengirim barang sesuai dengan waktu yang telah ditentukan, untuk memperoleh waktu total penyelesaian yang minimum. Masalah utama yang dihadapi oleh PT. ML adalah keterlambatan penyelesaian order yang mempengaruhi delivery time ke tangan costumer karena pelaksanaan penjadwalan produksi dilantai pabrik belum menghasilkan makespan yang sesuai dengan order yang ada. Oleh kaena itu dituntut untuk mencari solusi pemecahan masalah optimal dalam penentuan jadwal produksi untuk meminimisasi total waktu penyelessaian (makespan) semua order. Dalam penelitian ini, penjadwalan menggunakan metode Simulated Annealing (SA) diharapkan dapat menghasilkan waktu total penyelesaian lebih cepat dari penjadwalan yang ada pada perusahaan.   Scheduling is a very important aspect because in it there are elements of planning and production control for a company that can send goods in accordance with a predetermined time, to obtain a minimum total time of completion. The main problem faced by PT. ML is the delay in completing orders that affect delivery time to customer because the implementation of production scheduling on the factory floor has not produced the makespan that matches the existing order. Therefore, it is required to find optimal problem solving solutions in determining the production schedule to minimize the total time of elimination (makespan) of all orders. In this study, scheduling using the Simulated Annealing (SA) method is expected to produce a total time of completion faster than the existing scheduling in the company.


Sign in / Sign up

Export Citation Format

Share Document