Multi-objective complementary scheduling of hydro-thermal-RE power system via a multi-objective hybrid grey wolf optimizer

Energy ◽  
2019 ◽  
Vol 171 ◽  
pp. 241-255 ◽  
Author(s):  
Chaoshun Li ◽  
Wenxiao Wang ◽  
Deshu Chen
Author(s):  
Abdelkader Azzeddine Laouid ◽  
Abdelkrim Mohrem ◽  
Aicha Djalab

Purpose This paper aims to find the minimum possible number of phasor measurement units (PMUs) to achieve maximum and complete observability of the power system and improve the redundancy of measurements, in normal cases (with and without zero injection bus [ZIB]), and then in conditions of a single PMU failure and outage of a single line. Design/methodology/approach An efficient approach operates adequately and provides the optimal solutions for the PMUs placement problem. The finest function of optimal PMUs placement (OPP) should be mathematically devised as a problem, and via that, the aim of the OPP problem is to identify the buses of the power system to place the PMU devices to ensure full observability of the system. In this paper, the grey wolf optimizer (GWO) is used for training multi-layer perceptrons (MLPs), which is known as Grey Wolf Optimizer (GWO) based Neural Network (“GW-NN”) to place the PMUs in power grids optimally. Findings Following extensive simulation tests with MATLAB/Simulink, the results obtained for the placement of PMUs provide system measurements with less or at most the same number of PMUs, but with a greater degree of observability than other approaches. Practical implications The efficiency of the suggested method is tested on the IEEE 14-bus, 24-bus, New England 39-bus and Algerian 114-bus systems. Originality/value This paper proposes a new method for placing PMUs in the power grids as a multi-objective to reduce the cost and improve the observability of these grids in normal and faulty cases.


Processes ◽  
2020 ◽  
Vol 8 (12) ◽  
pp. 1581
Author(s):  
Wenqiang Zhu ◽  
Jiang Guo ◽  
Guo Zhao ◽  
Bing Zeng

The hybrid renewable energy system is a promising and significant technology for clean and sustainable island power supply. Among the abundant ocean energy sources, tidal current energy appears to be very valuable due to its excellent predictability and stability, particularly compared with the intermittent wind and solar energy. In this paper, an island hybrid energy microgrid composed of photovoltaic, wind, tidal current, battery and diesel is constructed according to the actual energy sources. A sizing optimization method based on improved multi-objective grey wolf optimizer (IMOGWO) is presented to optimize the hybrid energy system. The proposed method is applied to determine the optimal system size, which is a multi-objective problem including the minimization of annualized cost of system (CACS) and deficiency of power supply probability (DPSP). MATLAB software is utilized to program and simulate the hybrid energy system. Optimization results confirm that IMOGWO is feasible to optimally size the system, and the energy management strategy effectively matches the requirements of system operation. Furthermore, comparison of hybrid systems with and without tidal current turbines is undertaken to confirm that the utilization of tidal current turbines can contribute to enhancing system reliability and reducing system investment, especially in areas with abundant tidal energy sources.


Electronics ◽  
2021 ◽  
Vol 10 (2) ◽  
pp. 174
Author(s):  
Wenqiang Zhu ◽  
Jiang Guo ◽  
Guo Zhao

Islands are the main platforms for exploration and utilization of marine resources. In this paper, an island hybrid renewable energy microgrid devoted to a stand-alone marine application is established. The specific microgrid is composed of wind turbines, tidal current turbines, and battery storage systems considering the climate resources and precious land resources. A multi-objective sizing optimization method is proposed comprehensively considering the economy, reliability and energy utilization indexes. Three optimization objectives are presented: minimizing the Loss of Power Supply Probability, the Cost of Energy and the Dump Energy Probability. An improved multi-objective grey wolf optimizer based on Halton sequence and social motivation strategy (HSMGWO) is proposed to solve the proposed sizing optimization problem. MATLAB software is utilized to program and simulate the optimization problem of the hybrid energy system. Optimization results confirm that the proposed method and improved algorithm are feasible to optimally size the system, and the energy management strategy effectively matches the requirements of system operation. The proposed HSMGWO shows better convergence and coverage than standard multi-objective grey wolf optimizer (MOGWO) and multi-objective particle swarm optimization (MOPSO) in solving multi-objective sizing problems. Furthermore, the annual operation of the system is simulated, the power generation and economic benefits of each component are analyzed, as well as the sensitivity.