Structural integrity analysis for final design of ITER gas fueling manifold

2018 ◽  
Vol 133 ◽  
pp. 157-162
Author(s):  
Chengzhi Cao ◽  
Yudong Pan ◽  
Tao Jiang ◽  
Bo Li ◽  
Wei Li
2021 ◽  
Vol 16 (12) ◽  
pp. C12021
Author(s):  
F. Penzel ◽  
A. Pataki ◽  
H. Meister ◽  
L.C. Ingesson ◽  
U. Walach ◽  
...  

Abstract The ITER bolometer cable installation template is a first plasma component which main function is to provide a temporary fixation of the mineral insulated cables and to protect them through first plasma operation inside the vacuum vessel until the final bolometer cameras are installed in the second assembly phase. In this paper, the final design of the cable installation template will be presented, the assembly procedures and important functional design details in order to be compliant with its interfaces, the vacuum vessel, the flux loops, the electrical services, the first plasma components and the assembly. Requirements that drive the design will be explained, along with the technical solutions chosen to fulfill them. Important sub-components will be presented in more detail, such as the boss fixation, which will compensate geometrical uncertainties of the as-built boss positioning, as well as the mineral insulated cable holder, which will prepare the electrical termination and facilitate the installation of final vacuum vessel cameras during the second assembly phase of ITER. Additionally, the step-by-step assembly plan agreed with the team of ITER machine assembly and tooling will be described. A custom developed boss welding tool will be described as well. The system load specifications applicable for this first plasma component will be presented as well and an overview of the structural integrity analysis report will be given. It will be shown that most loads on the component are very limited and there is no risk of structural failure or loss of relevant system functions. The paper concludes with a summary of the work and an overview of the procurement and delivery status to ITER.


2018 ◽  
Vol 42 (4) ◽  
pp. 792-804 ◽  
Author(s):  
Mohamed Ali Bouaziz ◽  
Mohamed Amine Guidara ◽  
Christian Schmitt ◽  
Ezzeddine Hadj-Taïeb ◽  
Zitouni Azari ◽  
...  

2018 ◽  
Vol 135 ◽  
pp. 228-233
Author(s):  
Songke Wang ◽  
Jean-Marc Martinez ◽  
Tyge Schioler ◽  
Olivier Tailhardat ◽  
Robin Le Barbier ◽  
...  

Author(s):  
Yujin Wang ◽  
DeZhong Wang ◽  
Junlian Yin ◽  
Yaoyu Hu

The flywheel of latest coolant pump provides high inertia to ensure a slow decrease in coolant flow to prevent fuel damage after the loss of power. Flywheel comprises a hub, twelve tungsten alloy blocks and a retainer ring shrink-fit assembled on the outer surface of blocks. In the structural integrity analysis, the shrinkage load due to shrink-fit and the centrifugal load due to rotation are considered, so the wall thickness of retainer ring and the magnitude of shrink-fit are key variables. In particular, these variables will change the flywheel running state. This paper considers the influence of these variables, we employ Latin hypercube design to obtain the response surface model and analyze the influence of these variables. Finally we obtain the magnitude of wall thickness of retainer ring and the range of shrink-fit.


Author(s):  
Khalid Chaudhry ◽  
Andrei Blahoianu

While verifying the Primary Heat Transport (PHT) piping design for increased waterhammer loads due to sudden relief valve opening, it was discovered that linear piping analysis FEA program, which was relied upon extensively in the past, predicted overly conservative results. By overestimating the piping stresses, the stress results did not satisfy the ASME code, Section III, subsection NB-3652 Equation 9 limits for Level B service loading. During the course of investigation to meet ASME code limits, the licensee carried out a series of controlled actual waterhammer tests on thoroughly instrumented PHT piping and recorded the measured piping displacements. Waterhammer pressure-time histories created from these actual tests were then used as input into the standard linear piping analyses to compare analysis simulation results with the actual measured displacement data. It was observed that the analysis simulation results overestimated the piping displacement results by a large margin, i.e., by a factor of 5. A further insight into the analysis results indicated the presence of a single, the so called “killer” mode of vibration which accounted for nearly all of the PHT piping displacement response to test waterhammer loading. On a hypothetical basis, a restraint was applied in the direction of vibration of the pipe and the linear analysis was repeated. It was discovered that the simulated analytical piping response using a modified restraint had a much better match with the displacement results obtained during the actual test. From this hypothetical restraint application, it was inferred that friction between the supports and the pipe is the key ingredient which dampens the pipe oscillations and hence a lower response during the test than the linear analysis which does not consider the friction between the pipe and its guide support. This paper further investigates the contribution of structural damping, friction effects between the pipe and its supports (use of contact elements), fluid structure interactions and issues related to application of friction to carry out ‘modified’ nonstandard analyses to better predict the piping response to waterhammer transient loading.


2019 ◽  
Vol 97 ◽  
pp. 91-102 ◽  
Author(s):  
Elder Soares ◽  
Vivianne Marie Bruère ◽  
Silvana M.B. Afonso ◽  
Ramiro B. Willmersdorf ◽  
Paulo R.M. Lyra ◽  
...  

Buildings ◽  
2020 ◽  
Vol 10 (9) ◽  
pp. 158
Author(s):  
Cristina Cantagallo ◽  
Enrico Spacone ◽  
Daniele Perrucci ◽  
Nicola Liguori ◽  
Clara Verazzo

This study outlines a procedure for the seismic safety evaluation of historical buildings for engineers and architects that commonly work on buildings belonging to cultural and architectural heritage. The procedure is characterized by two interrelated phases: (a) building knowledge acquisition and (b) structural behavior analysis and safety assessment. The seismic safety evaluation strongly depends on the first phase, whose data can be obtained according to a multi-disciplinary approach based on five steps: (1) critical-historical analysis; (2) photographic documentation and geometrical survey; (3) structural identification and material survey; (4) foundation and soil survey; and (5) cracking pattern and structural integrity analysis. The proposed method was applied to the evaluation of the seismic safety of the Castle of Melfi (PZ, Italy). Comprehensive and multi-disciplinary knowledge of this monument greatly facilitated an accurate seismic analysis of this monument, which was conducted both at a local and global level using a linear kinematic analysis and non-linear static (pushover) analysis, respectively.


Sign in / Sign up

Export Citation Format

Share Document