Progressive collapse resistance of post-tensioned concrete beam-column assemblies under a middle column removal scenario

2020 ◽  
pp. 101945
Author(s):  
Muhannad Husain ◽  
Jun Yu ◽  
Basheer H. Osman ◽  
Jian Ji
2019 ◽  
Vol 136 ◽  
pp. 04050 ◽  
Author(s):  
M. Nassir ◽  
J. Yang ◽  
S. Nyunn ◽  
I. Azim ◽  
F.L. Wang

Recent studies regarding progressive collapse resistance of buildings considered only single critical column removal scenario. However, limited investigations have been conducted so far to assess multi-column removal scenarios. Hence this study is made to compare progressive collapse resistance of a multi-story building under both single and multi-column removal scenarios. An eight-storey reinforced concrete building was analyzed by using linear static analysis procedure and DCR values of the members are calculated to investigate the potential of progressive collapse as per GSA guideline. The values of DCR are compared for different cases. Comparisons of single and multi-column removal scenarios reveal that later scenarios are more critical because of their higher demand capacity ratios, and it is more critical when both corner and exterior columns are removed.


Sign in / Sign up

Export Citation Format

Share Document