Simultaneous nitrogen and phosphorus removal in an alternating intermittent aeration sequencing moving bed biofilm reactor

2018 ◽  
Vol 44 ◽  
pp. S162
Author(s):  
B. Zheng
2011 ◽  
Vol 71-78 ◽  
pp. 2844-2847
Author(s):  
Hai Yan Guo ◽  
Teng Teng Feng ◽  
Zhi Gang Liu ◽  
Zhen Guo

Laboratory scale experiments were conducted to study the performance and characteristics of nitrogen (N) and phosphorus (P) removal of a sequencing batch moving bed biofilm reactor (SBMBBR) with simple anaerobic/aerobic operating mode. Experimental results indicated that, under the operating condition of influent N concentration of 114 mg/L and P concentration of 12 mg/L, N and P removal efficiency reached 95% and 94% respectively under the conditions of influent COD/N (C/N) ratio of 2.8 to 4.0. Track studies of N, P and other operating parameters demonstrated that N removal was accomplished by anoxic denitrification during the filling and mixing stage and simultaneous nitrification and denitrification (SND) process in aerobic stage, while removal of P was realized through conventional phosphorus removal and denitrifying phosphorus removal processes.


2020 ◽  
Vol 167 ◽  
pp. 01008
Author(s):  
He Wang ◽  
Hui-qiang Li

This study combined the IA craft, and the goal is to achieve aerobic, anoxic and even anaerobic alternating cycles in the same reactor to enhance biological nitrogen and phosphorus removal. At present, there are many studies on the IA process, but less research on the IAMBBR craft. The IAMBBR craft combines intermittent aeration with a biofilm process, which can further improve the processing capacity of a continuous-flow biofilm reactor. Therefore, it is necessary to conduct a detailed study of the IAMBBR craft. In addition, the exposure time ratio is an important parameter for the operation of the IA craft. By adjusting the exposure time ratio, the DO concentration in the reactor can be controlled, which affects the operation effect of the reactor. Therefore, this chapter mainly explores the effect of exposure time ratio on the operating effect of IAMBBR. Six operating stages were connected: the ratio of CA and exposure time are 3h/3h, 1h/1h, 30min/30min, 15min/15min, and 5min/5min, respectively, to study the removal effect of pollutants.


1999 ◽  
Vol 40 (4-5) ◽  
pp. 161-168 ◽  
Author(s):  
H. Helness ◽  
H. Ødegaard

Experiments have been carried out with biological phosphorus removal in a sequencing batch moving bed biofilm reactor (SBMBBR) with a plastic biofilm carrier (Kaldnes) suspended in the wastewater. The aim of the research leading to this paper was to evaluate biological phosphorus removal in this type of biofilm process. Biological phosphorus removal can be achieved in a moving bed biofilm reactor operated as a sequencing batch reactor. In order to achieve good and stable phosphorus removal over time, the length of the anaerobic period should be tuned to achieve near complete removal of easily biodegradable COD in the anaerobic period. The total COD-loading rate must at the same time be kept high enough to achieve a net growth of biomass in the reactor. Use of multivariate models based on UV-absorption spectra and measurements of the redox potential show potential for control of such a process.


2019 ◽  
Vol 250 ◽  
pp. 109518 ◽  
Author(s):  
Francesca Iannacone ◽  
Francesco Di Capua ◽  
Francesco Granata ◽  
Rudy Gargano ◽  
Francesco Pirozzi ◽  
...  

2000 ◽  
Vol 41 (10-11) ◽  
pp. 217-225 ◽  
Author(s):  
G.T. Seo ◽  
T.S. Lee ◽  
B.H. Moon ◽  
J.H. Lim ◽  
K.S. Lee

A submerged membrane bioreactor (SMBR) was operated in 2-stage intermittent aeration for simultaneous removal of organic matter, nitrogen and phosphorus. The system consists of two reactors with a total volume of 0.27 m3 (1st reactor 0.09 m3 and 2nd 0.18 m3). Real domestic wastewater was used as influent to the system. Membrane used for this experiment was hollow fiber polyethylene membrane with pore size of 0.1μm and effective surface area, 4 m2. The membrane was submerged in the 2nd reactor for suction type filtration. Experiment was carried out in two phases varying the time cycles of aeration and non-aeration. SRT was maintained at 25 days and HRT, 16–19 hours. MLSS concentration in the reactors was in the range of 2,700–3,400 mg/l. The MLSS internal recycling ratio was maintained at 100% of influent flow rate. When time cycles of aeration and non-aeration were set at 30/90 min and 60/60 min in reactor 1 and 2, the removal of BOD and COD was 98.3% and 95.6%, respectively. A relatively low nitrogen and phosphorus removal was observed in this condition (73.6% as T–N and 46.6% as T–P). However, with 60/60 min intermittent aeration conditions for both reactors, the removal rate of nitrogen and phosphorus for two weeks steady state were enhanced to 91.6% as TN and 66% as TP, respectively. Further a high organic removal (98% BOD and 96.2% COD) was achieved too. In these conditions, the membrane of flux declined from 0.1 m/d to 0.08 m/d and suction filtration was at 10–12 kPa for a month long operation period.