scholarly journals Performance enhancement and multi-objective optimization of a double-flash binary geothermal power plant

Energy Nexus ◽  
2021 ◽  
pp. 100012
Author(s):  
Towhid Parikhani ◽  
Mostafa Delpisheh ◽  
Maghsoud Abdollahi Haghghi ◽  
Shahriyar Ghazanfari Holagh ◽  
Hassan Athari
2021 ◽  
Vol 13 (4) ◽  
pp. 1935
Author(s):  
Vitantonio Colucci ◽  
Giampaolo Manfrida ◽  
Barbara Mendecka ◽  
Lorenzo Talluri ◽  
Claudio Zuffi

This study deals with the life cycle assessment (LCA) and an exergo-environmental analysis (EEvA) of the geothermal Power Plant of Hellisheiði (Iceland), a combined heat and power double flash plant, with an installed power of 303.3 MW for electricity and 133 MW for hot water. LCA approach is used to evaluate and analyse the environmental performance at the power plant global level. A more in-depth study is developed, at the power plant components level, through EEvA. The analysis employs existing published data with a realignment of the inventory to the latest data resource and compares the life cycle impacts of three methods (ILCD 2011 Midpoint, ReCiPe 2016 Midpoint-Endpoint, and CML-IA Baseline) for two different scenarios. In scenario 1, any emission abatement system is considered. In scenario 2, re-injection of CO2 and H2S is accounted for. The analysis identifies some major hot spots for the environmental power plant impacts, like acidification, particulate matter formation, ecosystem, and human toxicity, mainly caused by some specific sources. Finally, an exergo-environmental analysis allows indicating the wells as significant contributors of the environmental impact rate associated with the construction, Operation & Maintenance, and end of life stages and the HP condenser as the component with the highest environmental cost rate.


2006 ◽  
Vol 129 (2) ◽  
pp. 125-133 ◽  
Author(s):  
Ahmet Dagdas

One of the most important cycles for electricity generation from geothermal energy is the double-flash cycle. Approximately 25% of the total geothermal based electricity generation all over the world comes from double-flash geothermal power plants. In this paper, performance analysis of a hypothetical double-flash geothermal power plant is performed and variations of fundamental characteristics of the plant are examined. In the performance analysis, initially, optimum flashing pressures are determined, and energy and exergy values of the base points of the plant are calculated. In addition, first and second law efficiencies of the power plant are calculated. Main exergy destruction locations are determined and these losses are illustrated in an exergy flow diagram. For these purposes, it is assumed that a hypothetical double-flash geothermal power plant is constructed in the conditions of western Turkey. The geothermal field where the power plant will be built produces geofluid at a temperature of 210°C and a mass flow rate of 200kg∕s. According to simulation results, it is possible to produce 11,488kWe electrical power output in this field. Optimum first and second flashing pressures are determined to be 530kPa and 95kPa, respectively. Based on the exergy of the geothermal fluid at reservoir, overall first and second law efficiencies of the power plant are also calculated to be 6.88% and 28.55%, respectively.


Author(s):  
S. Barsin ◽  
K. Aung

The present work investigates thermodynamic optimum conditions with respect to resource utilization by varying the operating pressure of flash drum for an existing geothermal power plant. The main focus of the study is to maximize the power output by minimizing the waste of liquid geothermal fluid re-injected to the well. For this purpose a double-flash system has been incorporated and the effect of operating at optimum flash pressures for both primary and secondary flash units is studied. An economic model is developed that calculates the total capital investment based on the cost of major equipments including pumps, flash drums, turbine generators, and condensers. From the results obtained it can be concluded that the plant at Svartsengi currently is working close to the optimum flashing pressure for the single-flash geothermal power plant. Providing an additional flash unit to convert the high temperature liquid coming from primary flash for Svartsengi and Nevada power plants increases the net power output by 12.7% and 28.9% respectively.


Sign in / Sign up

Export Citation Format

Share Document