Feasibility study of wind turbine system integrated with insulated Greenhouse: Case study in Tunisia

2021 ◽  
Vol 47 ◽  
pp. 101333
Author(s):  
Rim Ben Ali ◽  
Salwa Bouadila ◽  
Müslüm Arıcı ◽  
Abdelkader Mami
Author(s):  
Jafar Asghari ◽  
Mohammad Pourgol Mohammad ◽  
Farzin Salehpour Oskouyi

Fault Tree Analysis (FTA) is one of the most developed techniques in reliability studies; however static analysis is not able to encompass the dynamic behavior of complex systems. To overcome this problem, Dynamic Fault Tree (DFT) analysis is suggested in recent researches. The main motivation of this study is a comparative study on differences between Static Fault Tree (SFT) and DFT models of a typical mechanical system (case study of a wind turbine). Also, this paper is aimed to interpretation of the results and sufficiency analysis of SFT to model this system. This study, first presents a SFT analysis for a wind turbine system. Then, DFT is developed for the system. Monte Carlo simulation based method is applied for its analysis. The comparison showed that the DFT method presents more useful and realistic model of a wind turbine system. The proposed method improved the analysis through modification of dynamic gates.


2020 ◽  
Vol 12 (21) ◽  
pp. 8903
Author(s):  
Ming-Hong Chen ◽  
Yan-Ting Lin ◽  
Pao-Hsiung Chiu ◽  
Ching-Chang Cho ◽  
Huei Chu Weng

In the present study, the case study of micro-siting for the campus of the Institute of Nuclear Energy Research (INER) is conducted. Results from the effect of weather data suggest that for the wind turbine system higher than 20 m, the effect of nearby building and wake on electricity production would be less important. The effect of different weather data on the generated annual electricity production (AEP) is consistent for the wind turbine higher than 20 m. The difference between the calculated and real AEP of INER-150 kW wind turbine is only 1.1%, which is much better than some previous studies. The good agreement is mainly due to the higher height of the INER-150 kW (50 m), more stable coming wind and smaller impact of building on the performance of power production. Considering the proactivity on the installation for the site in INER campus, the finalized decision on the selection of wind turbine is 1 kW system. The power generation-related data are collected and processed for the fine tuning of model parameters in the future.


Author(s):  
Jagadish Suryadevara ◽  
Gaetana Sapienza ◽  
Cristina Seceleanu ◽  
Tiberiu Seceleanu ◽  
Stein-Erik Ellevseth ◽  
...  

2014 ◽  
Vol 9 (4) ◽  
pp. 835 ◽  
Author(s):  
Soedibyo Soedibyo ◽  
Ribka Stephani ◽  
Aprilely Ajeng Fitriana ◽  
Ratih Mar’atus Sholihah ◽  
Primaditya Sulistijono

Author(s):  
Maximilian Basler ◽  
Thuc Anh Nguyen ◽  
Felix Hruschka ◽  
Uwe Jassmann ◽  
Dirk Abel

Sign in / Sign up

Export Citation Format

Share Document