Improvement of the axial power distribution control capabilities in VVER-1000 reactors

2000 ◽  
Vol 27 (10) ◽  
pp. 949-957 ◽  
Author(s):  
F. Yousefpour ◽  
M.B. Ghofrani
2022 ◽  
Vol 168 ◽  
pp. 108917
Author(s):  
Chengxuan Zhao ◽  
Xiao Yang ◽  
Minghan Yang ◽  
Jianye Wang ◽  
Shuai Chen

Author(s):  
Achmad Solih ◽  
Jamaaluddin Jamaaluddin

Panel system power distribution at Lippo Plaza Mall Sidoarjo consists of several parts, namely from Cubicle 20 KV, 20 KV step-down transformer for 380 V, then the supply to LVMDP (Low Voltage Main Distribution Panel) The new panel to the user. Before delivery to users to note that the power factor is corrected using a capacitor bank. Less good a power factor is turned into inductive load on the capacitor bank so that temperatures high  because of high load resulting capacitor bank erupt. To overcome in this study proposes a safety panel automation power distribution control system using a microcontroller. Control system microcontrollers for safety panel power distribution consists of: Microcontroller (Arduino Nano), Light sensor (LDR), temperature sensor (LM35DZ), LCD 16x2 I2C, Actuators (fan, buzzer, relay switch breaker network three phase), switch ( relay 5 VDC), ADC as Input data. The working principle of this microcontroller LM35DZ if the sensor detects a high temperature fan will flash, if the LDR sensor detects sparks then the buzzer will sound as a warning sign of the dangers and disconnected the electricity network. From the design of a safety tool for power distribution panels due to high temperatures or sparks as well as the expected rate of fire outbreaks can be prevented.


2019 ◽  
Vol 2019 ◽  
pp. 1-8
Author(s):  
Shengzhe Li ◽  
Dongmei Yang ◽  
Tengfei Zhang ◽  
Xiaojing Liu

CIPS is a shift in the axial power towards the bottom half of the core, also known as axial offset anomaly (AOA), which results from the deposited of corrosion products during an operation. The main reason of CIPS is the solute particles especially boron compounds concentrated inside the porous deposit. The impact of CIPS is that the axial power distribution control may be more difficult and the shutdown margin can be decreased simultaneously. Besides, it also requires estimated critical condition (ECC) calculations to account for the effects of AOA. In this article, thermal-hydraulic subchannel code and boron deposit model have been combined to analyze the CIPS risk. The neutronics codes deal with the generation of homogenized neutron cross section as well as the calculation of local power factor. A simple rod assembly is analyzed with this combined method and simulation results are presented. Simulation results provide the boron hideout amount inside crud deposits and power shapes. The obtained results clearly show the power shape suppression in regions where crud deposits exist, which is a clear indication of CIPS phenomenon. And the CIPS effects on CHF have also been investigated. Result shows a margin of DNBR decrease in the crud case.


Author(s):  
Guangwen Bi ◽  
Chuntao Tang ◽  
Bo Yang

Elimination of soluble boron will be a challenge to reactor operation for PWR. This paper is to promote a control strategy of soluble boron-free operation for a small PWR, through selection of burnable poison (BP), BP loading and control rod loading, based on the reactivity balance and manage requirement. The analysis for on-power operation and shutdown condition indicated that this strategy could be suitable for long-term and short-term reactivity and power distribution control for soluble boron-free operation.


Sign in / Sign up

Export Citation Format

Share Document