DISTRIBUTION NETWORK MODERNIZATION IN TNB WITH THE APPLICATION OF LINE LIGHTNING PROTECTION DEVICE ONTO THE 33KV OVERHEAD LINES WITH HIGH SOIL RESISTIVITY IN TENAGA NASIONAL BERHAD - REIMAGINED TNB TOWARDS GRID OF THE FUTURE
Keyword(s):
2021 ◽
pp. 93-103
2019 ◽
pp. 539-547
Keyword(s):
Keyword(s):