Lessons Learned from Failure of a Large Diameter Water Pipeline

Author(s):  
Russell Gibson ◽  
Robert Allen ◽  
Steve Wilson ◽  
Wayne Brunzell
2021 ◽  
Author(s):  
Marco A Aburto Perez ◽  
Anurag S Yadav ◽  
Steven R Farley

Abstract Based on input from key operators in the Middle East region, a new rotary steerable system (RSS) was launched after a compressed development schedule. This paper describes the development and introduction of the larger tool sizes needed for both onshore and offshore hole sections, including hole sizes from 12 in. and up, in the Middle East. It also outlines the deliberate design of the tool for local assembly and repair. Large diameter (9-1/2 and 11 in.) RSS designs used an existing, smaller design for Middle East applications in both offshore and onshore wells as a basis. When designing these new sizes, engineers took note of lessons learned with smaller sizes of the tool and incorporated design elements for local manufacturing, assembly, and repair. The resulting simple, modular construction enables increased levels of local content and provides for significant reductions in transportation, and therefore associated emissions. Of course, although local content and sustainability are highly desirable, performance is essential, and this paper describes case histories demonstrating how well the new tool worked in real-world Middle East applications. In one notable example, the newly introduced 9 1/2-in. diameter RSS was used to drill an offshore section in the Gulf of Arabia. The tool was mobilized after two older generation RSS had become stuck for days. Consisting primarily of argillaceous limestone, the formation had a history of stuck-pipe events. The new RSS was recommended for this application because of a slicker construction, with a fully rotational bias unit, minimal bottom hole assembly (BHA) stabilization, and an optimized junk slot area, which together help to reduce stuck-pipe risks. The tool drilled to the target depth in a single run, thereby achieving all directional requirements. Notably, after reaching the target depth, the assembly was tripped out of the hole without any requirement for backreaming. This seamless exit, in turn, indicated achieving a smooth wellbore. Other case histories demonstrate results with both new sizes of this tool. The paper also discusses in detail the ability to repair locally and engage the local supply chain. Specifically with Middle East applications in mind, a new, simple RSS design in large diameter versions has demonstrated success in offshore and onshore applications across the region. The design has also proven capabilities for manufacturing and repair local to operations, which enables maximizing in-country value, optimizing use of the tools, and energizing local supply chains.


Author(s):  
Jeroen Timmermans ◽  
Ian Luff ◽  
Nicholas Long

While subsea production template and manifold designs have come to be dominated by standardized solutions tailored for specific hardware, the design of Pipeline End Manifolds (PLEM) remains largely project-specific. Nevertheless, some trends in PLEM design for large-diameter pipelines in moderate water depths have emerged in the past years in the North Sea and elsewhere; namely, large stand-alone structures on suction pile foundations with diverless spoolpiece tie-ins. This arrangement has proven successful on numerous projects; however, the move to remote arctic fields of significant production capacity and long design life introduces new design drivers that warrant a “fresh approach” to PLEM design. The developments currently being considered for the arctic will have to deal with: - Remote location making mobilization of installation assets a significant cost driver such that separate installation of pipeline and PLEM is relatively unattractive - Harsh conditions and short weather windows for installation favoring designs that reduce the number of separate installation steps and vessels - Poorer access for maintenance and repair during the operating life favoring designs that are modular and that allow recovery of critical components using the smallest possible intervention vessels. When combined with envisioned field production lives of 40 to 50 years, this means a very different set of design drivers will apply to the PLEM design. This paper presents an alternative PLEM design developed to overcome these challenges by: - Integrating of the PLEM with the pipeline to work around current industry limitations for large diameter diverless tie-in connector systems and to minimize ROV rotated sealing surfaces subsea in normal operation, - Introducing plug technology to remove the critical dependence on long-term trouble-free performance of large bore valves, - Introducing driven pile foundations to reduce structure size, prevent long-term settlements and eliminate the need for separate pipeline support frames by maintaining the pipe centerline close to the mudline, - Modularizing the system such that key components (all remaining valves) can be retrieved without complete shutdown of flow and such that installation / intervention can be performed using a wide range of vessels, and - Incorporating lessons learned from the successful design of a North Sea vertical diverless pig launcher unit. This paper presents an overview of the alternative PLEM design and discusses the status of the technologies required.


Author(s):  
Claude Faidy

Ageing management of Nuclear Power Plants is an essential issue for utilities, in term of safety and availability and corresponding economical consequences. Practically all nuclear countries have developed a systematic program to deal with ageing of components on their plants. This paper presents the ageing management program developed by EDF (Electricite´ de France) that are compared with different approaches in other countries, like IAEA (International Atomic Energy Agency)guidelines and GALL (Generic Ageing Lessons Learned) report. The paper presents an example of application to large diameter safety class piping. Different degradation mechanisms are considered fatigue, corrosion and thermal ageing. Maintenance and surveillance actions are also discussed in the paper.


2015 ◽  
Author(s):  
Alan C. Hutson ◽  
Russell L. Gibson ◽  
Jared Barber

2021 ◽  
Author(s):  
Gregory C. Sarvanis ◽  
Spyros A. Karamanos ◽  
Brent D. Keil ◽  
Richard D. Mielke

Author(s):  
Adam Pecush ◽  
Mark McTavish ◽  
Brian Ellestad

To serve the pumping and storage needs of its customers; Enbridge operates more than 25 terminals and 150 pump stations across North America. In each of these facilities, small diameter (NPS 6 and smaller) piping is used in auxiliary systems including instrumentation, measurement, and product re-injection. Traditionally, in the design of facilities, this small piping has received less attention than large diameter process lines and, during construction, has typically been field run based on standard installation details. This, in conjunction with 65 years of changing design and construction philosophies, as well as asset acquisitions, has resulted in a wide variety of installation configurations across the Enbridge liquids system. The Small Diameter Piping Program in the Facilities Integrity group centrally manages the integrity of all small diameter auxiliary piping across the Enbridge liquids system. Historically, the management and remediation of small diameter systems has been based on addressing specific installation types identified through incident investigations. While generally effective at minimizing re-occurrence, this approach has been limited in its ability to proactively identify installations that should be addressed. In support of our goal of zero incidents, Enbridge has developed a proactive methodology for the inspection and prioritization of small diameter auxiliary piping. Installation types are evaluated on their susceptibility to specific damage mechanisms. An inspection and prioritization model was developed through the combination of internal lessons learned and prioritization methodologies outlined in industry publications, specifically those from the overseas oil and gas industry. This model, sets a standardized process to assign a likelihood of failure (LOF) score to individual small diameter installations of specific types and/or functions. Presently, likelihood of failure scores are used to identify installations requiring remediation, and to most effectively prioritize system-wide remediation activities. Over time, these scores will also be used to demonstrate an overall reduction in the likelihood of failure for small diameter piping in the Enbridge liquids pipeline system.


Author(s):  
W. Leith McDonald ◽  
Gordon Gin ◽  
Rachel Boyle

This paper presents a case study of BP’s Mardi Gras Gulf of Mexico deep water pipeline transportation system. The Mardi Gras Transportation System (MGTS), operated by BP Pipelines, N.A. has set the standard for large diameter, deepwater pipeline design, construction and maintenance. The pipelines range in size from NPS 16 to NPS 30 in water depths up to 7,300 ft. The paper showcases the ArcGIS and PODS relational database management tools and the process of how we implemented programs to track underwater facility features and their displacements caused by the 2005 hurricane season. We will describe the challenges, solutions and new technology used to monitor and maintain the integrity of this pipeline system, even when covered by 5000 feet or more of water. Submarine (ROV) inspection technology, digital video and GPS are the order of the day. We shall demonstrate how GIS can assist in managing and reporting the results of the inspections and setup a database for long term managment of the pipeline system.


2011 ◽  
Vol 90-93 ◽  
pp. 2954-2959
Author(s):  
Yu Si Yang ◽  
Li Liu ◽  
Kun Li

According to the situation of Chinese urban water supply, this article has analyszed the possibility and computing method for water hammer that caused by pump stop in large diameter and high-lift water pipelines. In addition the impact of Full-featured Pump Curve on the water hammer calculation are also discussed. Finally, using the water hammer calculation of the primary pumping stations within a water-supply project which located in northeast China as an example, we had made corresponding conclusion.