Preliminary Study on Application of Building Information Modeling to Underground Pipeline Management

Author(s):  
Jia-Ruey Chang ◽  
Ho-Szu Lin
Author(s):  
Ghanim A. Bekr

This study involves with Building Information Modeling (BIM) and exploring the reasons behind the slow speed of implementing this method in the construction industry in developing countries in general and Jordan in specific. The aim of the research was achieved through a survey which considered 15 barrier factors and 13 driving factors. The study revealed that the level of BIM implementation in construction projects is generally low. In addition, the significant barriers affecting the adoption of BIM are lack of qualified staff to operate the software, difficulty learning BIM, the existing system fulfils the need, resistance to change and uncertainties concerning return on investment of BIM. Also, the study pointed out the most important factors that could help implementing BIM in the Jordanian construction industry. These are providing BIM training program, introducing BIM in the university curriculum and providing the efforts by the government to push implementation of BIM in their projects. Finally, the paper presented some recommendations if followed the level of (BIM) implementation in this country may be improved.


Author(s):  
Seunghwa Park ◽  
Inhan Kim

Today’s buildings are getting larger and more complex. As a result, the traditional method of manually checking the design of a building is no longer efficient since such a process is time-consuming and laborious. It is becoming increasingly important to establish and automate processes for checking the quality of buildings. By automatically checking whether buildings satisfy requirements, Building Information Modeling (BIM) allows for rapid decision-making and evaluation. In this context, the work presented here focuses on resolving building safety issues via a proposed BIM-based quality checking process. Through the use case studies, the efficiency and usability of the devised strategy is evaluated. This research can be beneficial in promoting the efficient use of BIM-based communication and collaboration among the project party concerned for improving safety management. In addition, the work presented here has the potential to expand research efforts in BIM-based quality checking processes.


Sign in / Sign up

Export Citation Format

Share Document