Triple Bottom-Line Assessment of Alternatives for a Large-Diameter Transmission Main from a Congested 280-MGD Water Treatment Plant Site

Author(s):  
Gregory Welter ◽  
Adebola Fashokun ◽  
Kim Six ◽  
Bob Dudley ◽  
Narayan Venkatesan ◽  
...  
2021 ◽  
Author(s):  
Tara Callingham ◽  
Daniel Ooi ◽  
Linhua Fan ◽  
Felicity Roddick

Abstract Feedwater to Euroa Water Treatment Plant contains increasingly high levels of natural organic matter (NOM) which were determined to cause its strong earthy odour. A multidisciplinary approach was used to evaluate the coagulation process to better remove the taste and odour (T&O) causing organics from water supplied to the local towns. Such high levels of NOM require elevated doses of coagulant for removal, accounting for approximately 60% of the chemical costs. A need arose to reduce these operational costs. However, community expectations regarding T&O, and social and environmental impacts, are not typically considered in this process. The local water corporation, Goulburn Valley Water, undertook a case study involving a comparison of three coagulants to optimise the chemical coagulation process from a multidisciplinary (triple bottom line, TBL) perspective. The financial assessment incorporated operational costs and potential infrastructure requirements. The social assessment investigated the overall impacts on staff operating the water treatment plant and their broader community involvement. The environmental assessment focused on the impact on downstream infrastructure from changes in sludge volumes and wastewater quality, and third-party greenhouse gas emissions from chemical deliveries. From a TBL viewpoint, aluminium chlorohydrate was the most beneficial option.


2019 ◽  
Vol 10 (1) ◽  
pp. 16
Author(s):  
V. MANE-DESHMUKH PRASHANT ◽  
B. MORE ASHWINI ◽  
B. P. LADGAOKAR ◽  
S. K. TILEKAR ◽  
◽  
...  

2017 ◽  
Vol 16 (10) ◽  
pp. 2303-2315 ◽  
Author(s):  
Djamel Ghernaout ◽  
Abdelmalek Badis ◽  
Ghania Braikia ◽  
Nadjet Mataam ◽  
Moussa Fekhar ◽  
...  

2008 ◽  
Author(s):  
Angelina Johnston ◽  
Kevin O'Connor ◽  
Todd Criswell

2001 ◽  
Vol 1 (3) ◽  
pp. 91-96 ◽  
Author(s):  
L.J. Hem ◽  
E.A. Vik ◽  
A. Bjørnson-Langen

In 1995 the new Skullerud water treatment plant was put into operation. The new water treatment includes colour removal and corrosion control with an increase of pH, alkalinity and calcium concentration in addition to the old treatment, which included straining and chlorination only. Comparative measurements of internal corrosion were conducted before and after the installation of the new treatment plant. The effect of the new water treatment on the internal corrosion was approximately a 20% reduction in iron corrosion and a 70% reduction in copper corrosion. The heavy metals content in standing water was reduced by approximately 90%. A separate internal corrosion monitoring programme was conducted, studying the effects of other water qualities on the internal corrosion rate. Corrosion coupons were exposed to the different water qualities for nine months. The results showed that the best protection of iron was achieved with water supersaturated with calcium carbonate. Neither a high content of free carbon dioxide or the use of the corrosion inhibitor sodium silicate significantly reduced the iron corrosion rate compared to the present treated water quality. The copper corrosion rate was mainly related to the pH in the water.


Sign in / Sign up

Export Citation Format

Share Document