scholarly journals Normalising deviance in construction project organizations: a case study on the collapse of Carillion

2020 ◽  
Vol 38 (12) ◽  
pp. 1122-1138
Author(s):  
Sara Hajikazemi ◽  
Kirsi Aaltonen ◽  
Tuomas Ahola ◽  
Wenche Aarseth ◽  
Bjorn Andersen
2013 ◽  
Vol 19 (4) ◽  
pp. 492-504
Author(s):  
Fang-Ying Shen ◽  
Andrew S. Chang

Construction projects are highly fragmented with many participants and activities involved during construction, so coordination is complicated and critical for project organizations. The physiological functions of the human body such as the circulatory system are natural and effective. This study established a coordination system for construction projects by simulating the circulatory system to improve work effectiveness. The contractor has to coordinate the owner and suppliers, that is, like the heart does to the brain and various organs. A procedure was also developed and illustrated through a case study to use the system practically. The contractor engineer acting as a receptor evaluates coordination needs derived from project uncertainty and equivocality and collect time spent on coordination with various parties. Coordination time or amount is adjusted when coordination supply does not meet needs. This procedure can be applied on construction project organizations to plan and execute coordination work.


2003 ◽  
Vol 3 (2) ◽  
pp. 79-91
Author(s):  
Florence Yean Yng Ling ◽  
Mohammed Fadhil Dulaimi ◽  
Mohan Kumaraswamy ◽  
Arun Bajracharya

2017 ◽  
Vol 10 (1) ◽  
pp. 5-31 ◽  
Author(s):  
Anna-Maija Hietajärvi ◽  
Kirsi Aaltonen ◽  
Harri Haapasalo

Purpose The effective management of inter-organizational integration is central to complex projects. Such projects pose significant challenges for integration, as organizations struggle with constantly changing inter-organizational interdependencies and must develop and adapt integration mechanisms to meet new demands. The purpose of this paper is to understand what kinds of integration mechanisms are used and how they are developed and adjusted during the infrastructure alliance projects. Design/methodology/approach This study provides empirical evidence of integration dynamics in project alliancing by analyzing two infrastructure alliance projects – a complex tunnel construction project and a railway renovation project. The research approach is an inductive case study. Findings This paper identifies integration mechanisms adopted in two case projects and three central triggers that led to changes in the integration mechanisms: project lifecycle phase, unexpected events and project team’s learning during the project. Practical implications Integration capability should be a precondition for alliance project organizations and requires the adoption of a wide range of integration mechanisms, as well as an ability to adjust those mechanisms in response to everyday dynamics and emergent situations. Originality/value Although unplanned contingencies and the responses to them represent important influences in organizations, there is limited amount of research on the dynamics of integration. The findings will be of value in supporting the management of inter-organizational integration in complex, uncertain and time-critical construction projects.


2019 ◽  
Vol 2 ◽  
pp. 21-36
Author(s):  
Grażyna Gawrońska ◽  
◽  
Krzysztof Gawroński ◽  
Karol Król ◽  
Hubert Buzowski ◽  
...  

2016 ◽  
Vol 9 (4) ◽  
pp. 90-97 ◽  
Author(s):  
Z. Shi ◽  
◽  
Z. Huang ◽  
X. Zhu ◽  
J. Liu ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document