Key Construction Technology of HuSuTong Yangtze River Bridge

Author(s):  
Zongyu Gao ◽  
Wei Xu ◽  
Xinyong Mei ◽  
Yanfei Zhang ◽  
Xuejin Huo
2013 ◽  
Vol 718-720 ◽  
pp. 1938-1944
Author(s):  
You Sheng Zhao ◽  
Bin Zhou

t is easy to cause the Yangtze River embankment soil of slip even collapse to have a deep foundation pit construction adjacent to the Yangtze River outsideembankment,there are a lot of risk. In this paper, a new combining technique of construction for large caisson is presented. Based on the construction environment, theconstructiontechnology,the smaller earthwork excavation of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology combined with monitoring data for the open caisson excavation control is adopted. It has achieved relatively good results and summarized the advantages of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology in engineering application owing the reference value for engineering applications.


2012 ◽  
Vol 174-177 ◽  
pp. 1949-1952
Author(s):  
He Qun Li ◽  
Fang Zhang ◽  
Pei Pei Duan

Foundations are vital of constructing pagoda. First dig the foundations, and then tram trinity mixture fills one layer after layer. In order to reinforce foundations, wooden pillars and brocken stones are used, especially in softer soil zone. In addition, there is a minority of rock foundations, mainly in the south of the Yangtze River of China. Many ancient pagodas stand up to now closely related to solid foundations.


2013 ◽  
Vol 368-370 ◽  
pp. 1443-1449
Author(s):  
Jun Yang Wei ◽  
Bao Tian Wang ◽  
Jing Hua Zhang ◽  
Bin Zhou

It is easy to cause Yangtze River embankment soil slip or even collapse to have a deep foundation pit construction adjacent to Yangtze River outside embankment,with lots of risk . A new combined construction technique for large caisson is presented. The construction technology, the earthwork excavation of deep high pressure jet grouting pile combined with undrained open caisson construction technology, with data monitoring for the open caisson excavation control is adopted. This study mainly summarizes the advantages of deep high pressure jet grouting pile combined with undrained caisson combined construction technology engineering application, and describes the process of the combined construction and measures of deviation correction.The new combining construction technique has made a relatively effective protection for the Yangtze River levee and its ecological environment,having great engineering application value to some similar engineering.


Abstract: With the development of the cable-stayed bridge, the anchorage form on pylon of cable-stayed has been improved and innovated continuously, and the anchorage methods such as circumferential prestressed anchorage, steel anchor beam and steel anchor box have been gradually formed and developed, which further increases the span of cable-stayed bridge and meets the social needs of economic development and environmental integration. The group aggregated anchorage system between cable and pylon is a kind of anchorage form outside the pylon, which has the characteristics of clear force transmission, simple structure and high construction efficiency. It has been successfully applied in Chizhou Yangtze River Bridge for the first time. The main span of Chizhou Yangtze River Bridge is 828m, and the cable-stayed bridge with spatial cable plane of two towers is constructed. Six steel beams are deployed between tower legs to anchor 54 pairs of cables respectively. The steel beams and the concrete tower columns are effectively connected by prestressed anchors, shear nails and short steel bars, which could transfer the cable force to the tower column reliably. This kind of anchoring system has clear force transmission, which could reduce the tensile stress of concrete tower column and the risk of concrete cracking. Meanwhile, the steel beam could be constructed by the engineering manufacture and the field installation, which could reduce the working time at height, further the construction quality and safety could be controlled. Based on the construction of Chizhou Yangtze River Bridge, this paper mainly introduces the proposal, construction, key construction technology and engineering application effect of group aggregated anchorage system. The engineering practice proves that this new type of anchorage could not only meet the basic requirements of the intrinsic safety of the bridge, but integrate with the regional culture to create the beauty of natural harmony as well.


2014 ◽  
Vol 501-504 ◽  
pp. 1274-1278 ◽  
Author(s):  
Yong Tao Zhang ◽  
Xin Li ◽  
Xin Peng You

Jiu-Jiang Yangtze River Highway Bridge, with a main span of 818m, is another long span hybrid girder cable-stayed bridge which connects Jiang Xi province and Hu Bei province in China. Steel box girder is adopted in main span and north side span, and main girder of south side span and south tower nearby is designed of concrete box girder. The pylon is concrete structure, with the height of 242.3m and H-shape. There are 216 cables used in this bridge, of which are assembled by parallel strands. Jiu-Jiang Yangtze River Highway Bridge began to construct in 2009, and was closed in December, 2012. The bridge opened to traffic officially in the next year. Design concept, construction method and vibration control measures about Jiu-Jiang Yangtze River Highway Bridge are introduced in this article.


2020 ◽  
Vol 17 (2) ◽  
pp. 29
Author(s):  
Nurhafizah Abdul Musid ◽  
Haryanti Mohd Affandi ◽  
Nurul Eizzaty Sohimi ◽  
Mohd Firdaus Mustaffa Kamal

On Job Training (OJT) is best for skill development and attitude change. Implementation of OJT which focuses on the transition of students to working life, however with little attention given to the process of assessment in OJT. Therefore, the aim of this study is to investigate the OJT assessment problems among Construction Technology students in Malaysian Vocational College. The research design for this study uses a survey that was carried out qualitatively through semi-structured interviews among Construction Technology students, lecturers and experienced construction practitioners. From the data analysis, it has been identified that there is an inadequacy of OJT assessment rubric in assessing the skill and knowledge of the construction technology students. This has been contributed with the used of holistic rubric for the OJT assessment which has been designed to be use by every course in the Vocational College. The result also revealed that allocation of marks in the assessment rubric is not commensurate with some construct assessed and need to be reviewed. This study shows that an assessment rubric should emphasizes on specific knowledge and skills in assessing students’ competency during training program and in this case to produce competent site supervisor. In addition, a good assessment rubric should consider the tasks and marks thoroughly to avoid biasness among students. Therefore, it is suggested to carry out further study in investigating the validity and reliability of current industry’ OJT assessment rubric for the Construction Technology students.Key Words: On Job Training; Construction Technology; An assessment rubric; Competency; Validity and reliability.


Sign in / Sign up

Export Citation Format

Share Document