High Pressure Rotary Jet Grouting Pile with Undrained Caisson Combined Construction Technology on Nearby Yangtze River Levee Protection
t is easy to cause the Yangtze River embankment soil of slip even collapse to have a deep foundation pit construction adjacent to the Yangtze River outsideembankment,there are a lot of risk. In this paper, a new combining technique of construction for large caisson is presented. Based on the construction environment, theconstructiontechnology,the smaller earthwork excavation of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology combined with monitoring data for the open caisson excavation control is adopted. It has achieved relatively good results and summarized the advantages of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology in engineering application owing the reference value for engineering applications.