Corruption in the construction industry: a review of recent literature

Author(s):  
B. K. Monteiro ◽  
G. Masiero ◽  
F. R. de Souza
2018 ◽  
Vol 203 ◽  
pp. 02010 ◽  
Author(s):  
Wesam S Alaloul ◽  
Mohd Shahir Liew ◽  
Noor Amila Wan Abdullah Zawawi ◽  
Bashar S Mohammed

The future of construction industry development is the approach of the component-industrialization, the construction-breakdown, design-identical, construction-assembled, operation-data technique to maximize the life cycle value. This paper presents a general idea of Industrial Revolution (IR) 4.0 with the introduction descriptions of important aspects in Construction Industry (CI) development. The aim is to define and show possible research areas connected with the IR 4.0 into the CI. For this purpose, an analysis was made, based on the most recent literature, to point out actual needs in the CI in terms of its evolution into IR 4.0 level. It is shown that multidiscipline approaches are not investigated to create special rules, procedures and methods and know-how designed for introducing the principles of IR 4.0 in the CI. A popular from stakeholders in the CI understand how digitization is affecting each part of their trade, however, its practical applications are still in infancy stage. IR 4.0 concepts should be combined with construction production, novel expertise must be applied to the intellectual engineering of modern construction, enhance the level of incorporation, to achieve the sustainable development.


2018 ◽  
Vol 6 (2) ◽  
pp. 173-178 ◽  
Author(s):  
Christiane M. Herr ◽  
Thomas Fischer

Abstract Despite strong encouragement by government guidelines and promoting efforts by the software industry, BIM is adopted at relatively slow speeds in construction industries across the world. The study presented in this paper examines the challenges to BIM adoption faced specifically in the Chinese construction industry across architecture, engineering and construction. We review recent literature addressing BIM adoption in the international context and develop a critique of common approaches to describe processes of BIM adoption. Substantiated with the analysis of detailed survey data obtained from AEC professionals in the greater Shanghai area, we propose a new, extended model to describe and assess processes of BIM adoption. Utilising this model, we evaluate temporal and collaborative dimensions of BIM adoption, and present results from detailed survey data. We further discuss how current Chinese BIM adoption in practice diverges from overseas BIM adoption strategies and examine how the extended BIM adoption model can provide a more accurate representation of BIM adoption processes observed in practice in and beyond the context of the Chinese AEC industries. Highlights BIM adoption across the Chinese AEC industries is still uneven and over reported. Chinese AEC industries' BIM adoption differs from overseas models. An extended BIM adoption model allows charting BIM adoption along AEC workflows. BIM is adapted for linear Chinese workflows rather than collaborative work.


Author(s):  
D. E. Speliotis

The interaction of electron beams with a large variety of materials for information storage has been the subject of numerous proposals and studies in the recent literature. The materials range from photographic to thermoplastic and magnetic, and the interactions with the electron beam for writing and reading the information utilize the energy, or the current, or even the magnetic field associated with the electron beam.


Author(s):  
L. F. Allard ◽  
E. Völkl ◽  
T. A. Nolan

The illumination system of the cold field emission (CFE) Hitachi HF-2000 TEM operates with a single condenser lens in normal imaging mode, and with a second condenser lens excited to give the ultra-fine 1 nm probe for microanalysis. The electron gun provides a guaranteed high brightness of better than 7×l08 A/cm2/sr, more than twice the guaranteed brightness of Schottky emission guns. There have been several articles in the recent literature (e.g. refs.) which claim that the geometry of this illumination system yields a total current which is so low that when the beam is spread at low magnifications (say 10 kX), the operator must “keep his eyes glued to the binoculars” in order to see the image. It is also claimed that this illuminating system produces an isoplanatic patch (the area over which image character does not vary significantly) at high magnification which is so small that the instrument is ineffective for recording high resolution images.


2012 ◽  
Vol 17 (2) ◽  
pp. 69-75 ◽  
Author(s):  
Pamela A. Smith

In this article, I will review the available recent literature about the aging population with autism, a patient group that researchers know little about and a group that is experiencing a growing need for support from communication disorders professionals. Speech-language pathologists working with geriatric patients should become familiar with this issue, as the numbers of older patients with autism spectrum disorders is likely to increase. Our profession and our health care system must prepare to meet the challenge these patients and residents will present as they age.


2017 ◽  
Author(s):  
Hannah M. Curtis ◽  
Hendrika Meischke ◽  
Nancy Simcox ◽  
Sarah Laslett ◽  
Noah Seixas

Author(s):  
Kambiz Rasoulkhani ◽  
Abdullah Alsharef ◽  
Siddharth Banerjee ◽  
Sudipta Chowdhury ◽  
Qingchun Li ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document