MAS-based evaluation method of production performance for coal export terminals

2020 ◽  
pp. 1-21
Author(s):  
Benfei Zhu ◽  
Qiang Zhou ◽  
Yu Tian
2019 ◽  
Vol 141 (12) ◽  
Author(s):  
Renfeng Yang ◽  
Ruizhong Jiang ◽  
Shirish Patil ◽  
Shun Liu ◽  
Yihua Gao ◽  
...  

Abstract The main characteristic of the complicated carbonate reservoirs is notably strong heterogeneous, leading to a high uncertainty in formation parameter evaluation. The most reliable method for obtaining the dynamic parameters is well test interpretation. However, the well test curve shows similar characteristics for multi-layers reservoirs, dual-medium reservoirs, and carbonate reservoirs with lithology mixed sedimentation lithology. Sometimes the well test fitting result under the mentioned three kinds of models is satisfied, but the interpretation result is quite different. In order to reduce the parameter evaluation multiplicity, the synthetic identification and evaluation method for obtaining the physical parameters of the complicated carbonate reservoir was proposed, based on completion types, core analysis, lithology analysis, and well test results. The evaluation method distinguishes the different carbonate reservoir characteristics from similar well test responses by summarizing and classifying the completion method, reservoir fracture characteristics, and production logging test (PLT) results. The reliability of the proposed method is verified by an application of actual carbonate reservoir parameters evaluation. The proposed method can distinguish among multi-layers reservoirs, dual-medium, and complicated reservoirs with mixed sedimentation lithology whose main characteristic is that concavity existing in the pressure derivative curve. If the well test match results were satisfied enough which lead to the proposed method and process was ignored, the interpretation results and production performance prediction may deviate largely from the actual situation.


2017 ◽  
Vol 47 (12) ◽  
pp. 1331-1340
Author(s):  
GaoWei HU ◽  
BaiLian CHEN ◽  
YongLe HU ◽  
DaiGang WANG ◽  
Yong LI ◽  
...  

2018 ◽  
Vol 165 ◽  
pp. 171-180 ◽  
Author(s):  
Zhang Zhi ◽  
Li Jing ◽  
Zheng Yushan ◽  
Zhang Cheng ◽  
Zhang Qingsheng ◽  
...  

2012 ◽  
Vol 2012 ◽  
pp. 1-8
Author(s):  
An-Qi Li ◽  
Yan-Rong Chang ◽  
Xin-Hai Kong

In view of the existing situation of oilfield development, one kind of method to evaluate the production performance of reservoir management units (RMUs) was presented in this paper. Among the commonly used indicators of oilfield development, select 12 indicators from the three aspects of production task, production technology, and reservoir development. According to the principle of fuzzy analytic hierarchy process (FAHP), this paper introduced one kind of new method to get the weights of indicators. By means of the method of TOPSIS, it is easy to obtain the rankings for all the RMUs through calculating the weighted Euclidean distance between each RMU and the positive or negative ideal RMU. Considering the gap between the differences in RMUs, the production performance appraisal ratings of RMUs are determined by fuzzy clustering. This evaluation method could constantly improve the management level of reservoir units and deepen the delicacy management of oilfield development.


2013 ◽  
Vol 663 ◽  
pp. 905-910 ◽  
Author(s):  
Xing Chun Li ◽  
Zhao Sun ◽  
Xian Yuan Du ◽  
Meng Wang ◽  
Yu Li

Refinery and chemical enterprises in China are mostly of high energy consumption and high pollution enterprises, so that greenhouse gases, SO2, NOX, NH3-N, and COD have great emission reduction potential. At the present stage, refinery enterprises emission reduction potential just for a pollutant is not comprehensive enough. Based on the above-mentioned five pollutants of refinery and chemical enterprises, the pollution reduction potential model are established by using linear programming method, which can provide decision support of emission reduction for refinery and chemical enterprises during the "12th Five Year Plan". The comprehensive index evaluation method not only can be used to clean production evaluation about evaluation of the environmental impact of large-scale integrated refinery project, also can be used to clean production audit of existing projects and enterprises to implement cleaner production performance evaluation.


Sign in / Sign up

Export Citation Format

Share Document