scholarly journals Supplier selection in rank order using fuzzy ahp and fuzzy molp with sensitivity analysis

2020 ◽  
Vol 1524 ◽  
pp. 012094
Author(s):  
F H Kurniawan ◽  
B Surarso ◽  
J E Suseno
2020 ◽  
pp. 133-139
Author(s):  
Sanatan Ratna ◽  
B Kumar

In the past few decades, there has been lot of focus on the issue of sustainability. This has occurred due to the growing concerns related to climate change and the growing awareness about environmental concerns. Also, the competition at global level has led to the search for the most sustainable route in the industries. The current research work deals with the selection of green supplier in a Nickle coating industry based on certain weighted green attributes. For this purpose, a hybrid tool comprising of Fuzzy AHP (Fuzzy Analytical Hierarchy) and VIKOR (VlseKriterijumska Optimizacija I Kompromisno Resenje) is used. The Fuzzy AHP is used for assigning proper weights to the selected criteria for supplier evaluation, while VIKOR is used for final supplier selection based on the weighted criteria. The three criterions for green supplier selection are, Ecological packaging, Corporate socio-environmental responsibility and Staff Training. The outcome of the integrated model may serve as a steppingstone to other SMEs in different sectors for selecting the most suitable supplier for addressing the sustainability issue.


2019 ◽  
Vol 14 (1) ◽  
pp. 77-105 ◽  
Author(s):  
Md. Tanweer Ahmad ◽  
Sandeep Mondal

PurposeThis paper aims to address the supplier selection (SS) problem under dynamic business environments to optimize the procurement cost of spare-parts in the context of a mining equipment company (MEC). Practically, involved parameters’ value does not remain constant as planning periods due to fluctuation in the demand and their market dynamics. Therefore, dynamicity in the parameter is considered as an important factor when a company forms a responsive chain through most eligible suppliers with respect to planning periods. This area of study may be considered for their complexities to the approaches toward order-allocations with bi-products of unused and repair spare-parts.Design/methodology/approachAn integrated methodology of analytic hierarchy process (AHP) and mixed-integer non-linear programming (MILP) is implemented in the two stages during each planning periods. In the first stage, AHP is used to obtain the relative weights with respect to each spare-parts of each criterion and based on that, the ranking is evaluated in accordance with case considered. And in the second stage, MILP is formulated to find the allocations of each spare-part with two distinct approaches through Model-1 and Model-2 separately. Moreover, Model-1 and Model-2 are outlined based on the ranking and efficient parameters-value under cost, limited capacities, quality level and delay lead time respectively.FindingsThe ranking and their optimal order-allocation of potential suppliers are obtained during consecutive planning periods for both unused and repair spare-parts. Subsequently, sensitivity analysis is conducted to deduce the key nuggets with the comparison of Model-1 and Model-2 in the changing of capacity, demand and cost per spare-parts. From this analysis, it is found that suppliers who have optimal parameter settings would be better for order-allocations than ranking during the changing planning period.Practical implicationsThis paper points out the situation-specific approach for SS problem for a mining industry which often faces disruptive supplying environments. The managerial implication between ranking and parameters are highlighted through Model-1 and Model-2 by sensitivity analysis.Originality/valueIt provides useful directions for managers who are involved in the procurement of spare-parts in the mining environment. For this, suppliers are selected for order-allocation by using Model-1 and Model-2 in the dynamic business environment. The solvability of the model is presented using LINGO 17. Furthermore, the case company selected in this study can be extended to other sectors.


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Aula Fajar Iman Sakti ◽  
Wiwik Sulistiyowati

CV. Riki Utama Mandiri is a company in distributing an economic fish frozen product. This company distributed any kind of retail and wholesaler, both domestic and export. They distributing many frozen fish products variant such as Patin Fillet and Shark Fin. The all raw materials of those frozen seafood was obtained by three different suppliers. The common problems found in CV. Riki Utama Mandiri mostly about raw patin fish supplier which often committed delivery delays.  The purpose of this research is to fixing the supply chain management in deciding the more accurate selections of raw materials supplier. To overcome the common problems that happen. Analytical network process (ANP) will simplify the criteria weight values and sub criteria of each supplier. Meanwhile, technique for others reference by similarity to ideal solution (TOPSIS) method is used for giving a rank order of the alternative supplier. This research is expected for being a consideration for the company in obtaining a good and more effective kind of raw supplier. We also expecting the company for tighten supplier selection more effective way so that it can fullfilled the existing standard. Also to overcome the common problems such as delivery delays, competing raw materials with uncertain quality, and difficulty in sort out the raw materials due to size issues.


Sign in / Sign up

Export Citation Format

Share Document